2023 is a year of milestones for the Fredericksburg based STEM rocket program beginning with White Sands Missile Range hosting the SystemsGo Rocket Program again for its season end launches. This event marks the 25th year the STEM based program has brought high school seniors to the Army Base to test the program’s highest-level rockets, known as Goddard. It would have marked 25 consecutive years, but COVID took out 2020 putting the numbers behind by a year. The program took its first rocket from Fredericksburg High School to WSMR in 1999. The nonprofit organization supporting this STEM program in schools officially began in June of 2003, making this 2023 season its 20th Anniversary as well. This year three schools will be traveling to New Mexico to test their rockets at White Sands Missile Range, they include: Alamo Heights HS, Brazoswood HS and Union Grove HS.
June 23rd through June 25th are the dates for this year’s WSMR launch. The SystemsGo team and schools will be traveling to Alamogordo, New Mexico for lodging on June 22nd. Early on the 23rd, preparations at the site will be made with the goal of launching all three rockets Saturday afternoon. The 25th is our contingency day, but it is only a contingency for completing cleanup at the site, or if WSMR must delay our launches. It will not be a day to recycle rockets that fail.
We continue to launch from range ABC1. This range required the altitude cap for the rockets to be adjusted from the 20-mile radius the program previously had available for these test vehicles to travel and stay within their parameters. The original height cap was 100,000 feet. The current cap instituted two years ago is 50,000 feet. ABC-1 does not have a large bunker, so only essential launch personnel stay on site, and the SG staff evacuate out five miles for launches. Students and teachers are taken to a secure location known as Tula G, which is further down range where they watch the launches on screen inside a designated facility. Parents are no longer allowed to come, since the theater at Mission Control is no longer the viewing area. Volunteer staffing of base personnel for this has still not resumed.
Schools are asked to arrive early on the 22nd in Alamogordo to do pressure checks with as little time spent on configuration as possible. At least two vehicles need to have this stage complete before heading down range on the 23rd. Preferably very little time will be spent on assembly on the 23rd. Some weight, CG, and FFR verification can be done if needed downrange the 23rd. There will be tents on the range, the same as last year. Rockets need to be complete by the end of the day on Friday.
The first T time on Saturday will be 8:00 a.m. After that the range is Hot all day for us, which translates to as soon as we can reset and be ready to launch again, WSMR is ready to assist. This should make keeping the schedule and sending all three rockets skyward a viable task for Saturday.
WSMR personnel, including Test Center Commander, Colonel Shawanta Smart, and Range Operator, Lori Leyva, will be on site during the launches. WSMR will be providing lunch for all participants. Colonel Smart began her command in August of 2021, making this her second rocket season with the program. She stopped in last year for a brief visit, but plans to be onsite to see more of how the program operates. Ms. Leyva will be retiring after this year. Her service in coordinating SystemsGo and WSMR in launch efforts has been extremely beneficial to the program over the years she has been with us. SystemsGo will be making special presentations during the lunch break.
Saturday is a contingency day, but preferably it should be no more than a site cleanup day if needed that morning. Provided that we accomplish this early the remainder of the day’s activities will be decided at that time.
SystemsGo team members will be residing at the Quality Inn and Suites in Alamogordo this year.
There are three schools scheduled to launch four rockets. These include:
- Union Grove
- Alamo Heights
- Brazoswood
The current launch schedule is as follows:
- Thursday, June 22nd
- Travel Day
- Pressure Checks and FRRs that evening at the hotels.
- Security checks of all Form 5000s
- Friday, June 23rd
- Site Set up ABC-1 9:00- 9:30 a.m.
- Depart for site from hotel by 7:45 a.m.
- Complete all rockets.
- Leave the site with Union Grove and Alamo Heights on the rails.
- Saturday, June 24th
- Launch Day (Three Rockets, barring any schedule changes by WSMR.)
- Depart from hotel by 4:45 a.m. for 6:00 a.m. arrival on site.
- Projected launch schedule:
- T1 8:00 a.m. –
- T2
- T3
- Break for Lunch 2:00 p.m. – 3:00 p.m.
- Range Time Ends – unspecified currently.
- Sunday, June 25th
- Contingency Day/Cleanup/Fun Day/ Travel (To be determined.)
- Monday, June 26th
- Travel Day
The schedule as seen above is a preliminary estimate, and though accurate as stated by Program Director, Rebekah Hyatt, at the moment, is subject to changes and adjustments as needed once the entire group is in New Mexico.
The Goddard level rockets, which are the capstones of the SystemsGo program and the culmination of all the skills the students have learned throughout their years in the STEM program. This marks the final senior project for the schools that participate in for the SystemsGo program.
www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be benefited.
#Rockets2023 #SystemsGo #Launcher01 #RideTheSky #Texasrockettrail #EyesOnTheSkies #TexasToNewMexicoRocketTrail