WSMR Rockets 2026, Friday Launch Excitement

A 0500 call to move out for ABC-1 started the day for all SystemsGo team and schools. The original mission, to launch 3 rockets and load 2 more on the rails and be Mission Complete and off range by 1600. Our scheduled T-Times were 0800, 1000, and 1100.

All personnel arrived at the gate at 0545 for security and ID checks. Then SystemsGo Team including the gas truck crew were pulled ahead and escorted to ABC-1 to begin launch sequence preparations. We arrived around 0620 and quickly began preparations.

George Burns, Ginger Burow and Rebekah set up the electronics trailer, fill and fire system, and tested each rail. Steve Burow set up the pad, rails and wiring for the launch rails. Students from the teams helped erect the rails before finishing work on their vehicles.

Andrew Matthes coordinated the gas fill crew at the pad. This actually left his team working diligently by themselves at Tula G to complete their final pressure test issues. It also took Kash from the gas crew to facilitate those pressure tests for Fredericksburg and Anahuac/Hardin Jefferson.

Schools Participating this weekend were Alamo Heights, Anahuac/Hardin Jefferson, Brazoswood, Union Grove (aborted yesterday due to repeated failed pressure tests) and Fredericksburg. Alamo Heights and Brazoswood’s 2026 were fit with charges and loaded onto the rails ready for launch yesterday evening.

Alamo Heights was the first launch of the day. It left the rail at approximately 0830, only about 30 minutes behind our projected T-Time of 0800. It was slow off the rail, burning as it went and then hovered slightly above the rail for about 20 seconds before hopping the nose cone, and then lifting away, doing end to end loops and belly flopping into the range about 200+/- yards south of the rail.  EOD came in quickly and recovered it. Doc Photo took a picture of the nose cone lying by the rail.

After EOD cleared the area, the teams came in and Brazoswood loaded it’s 2025 rocket onto the first rail Alamo Heights has just left. After it was ready for launch, Steve took Kash to Tula G to help check pressure on Fredericksburg and Anahuac/Hardin Jefferson’s rockets.

Brazoswood 2026 left the rail around 1050, slightly ahead of its projected T-Time. We had a slight delay turning on the altimeter because the indicator sounds could not be heard, but the students determined that it should be fine. It lifted off the rail quickly and sailed into the sky with a beautiful flight. It reached an altitude of 20,000 feet . It was supposed to have a computer system tracking telemetry, but the students reported that the system had gone down. This one was also found by EOD today but had significant damage from nosing into the range.

Brazoswood 2025 was the third and final launch for the day. At 1250 it flew straight, true and high reaching 41,000 feet. It came down under chute. Unfortunately, it had not bee found by the time we completed our mission time and left the range. It was an awesome flight though.

After the completion of Brazoswood’s 2025 launch everyone was called back to ABC-1. While they were in transit, Rebekah and George shut down the pad for the day. The gas crew came back in, and we all ate lunch while we waited for the rest of the schools to return.

Brazoswood and Alamo Heights loaded up the remains of their rockets. It was decided to drop Fredericksburg in its trailer at the site ready to load charges in the morning for launch tomorrow. It was also decided that Anahuac/Hardin Jefferson would abort mission as the leaks it had could not be fixed in time to launch tomorrow.

Rebekah and George spoke to the schools before we moved out since only Fredericksburg would be returning tomorrow.

 Temperature on the range only made it to 107 degrees today. Ten degrees cooler than yesterday.

A line of showers popped up just northwest of the range at the end of the day. We left the range by 1505 headed back to Alamogordo. The storm was right over Alamogordo when we got there. After it was over a pretty heavy windstorm moved in.  

The team rested for a bit and then walked over Johnny Carinos’s for dinner. We had a real nice time. We talked about rockets, had great food and dessert. Everyone turned in afterwards.

Fredericksburg is the only rocket left to launch tomorrow. We should be packed up early afterwards. At this point I am leaving the schedule showing the extra two T-times, but we should not need them.

After the completion of Alamo Height’s launch. Eveyone returned to ABC-1 and Brazoswood were loaded onto the rails for tomorrow’s launches. Brazoswood will eihter load their 2026 and 2025 recyle onto the rails for the last two T-Times.

Along with all the regular excitement of launching rockets, today was an extra special day for me. I was asked to stay on pad and help the SystemsGo directors do the actual launching of the rockets. I walked through the launch sequence steps with George and then evacuated to the bell with him and Rebekah.

On the first rocket, I was asked to man the MSS switch for the launch. It requires that you hold it down for the last 20 seconds of the count down and until your hear the rocket actually lift off the rail.

For the second launch, I was allowed to actually flip all the switches that launch the rocket. They have to be done in sequence at different intervals during the countdown. First opening the safety covers and setting the system to fire at 30 seconds, then activating the oxygen switch at 10 seconds and both the ignition and injection switches at “0”. Both of these were nerve racking, exciting and fun.

On the last rocket Rebekah and George manned the MSS and Fire sequences. I got to stand inside the back of the bell and hold a mirror around the corner in order to watch the rocket go up. That was really cool. It was an amazing day. I am looking forward to tomorrow.

Good luck tomorrow Fredericksburg!

Saturday’s schedule is the following:

  1. Saturday, June 13th
  2. 0500 Depart from Hotel
  3. 0530 arrival at Tula Gate for Security checks/Proceed to ABC-1
  4. 0800 T #4 –
  5. 1000 T #5 –
  6. 1200 T #6 –
  7. 1400 Spare T-Time (In case 1100 T doesn’t work on 6/12)
  8. 1600 Complete All – Site is packed/loaded and headed out

SystemsGo now has two launch rails and both will be in operation tomorrow. A rocket will be loaded onto each rail and then tested in sequence with only time out for safety. The launch team will be required to evacuate during each launch; and then return to swap out gas and electrical connections between the rails.

Launches are to commence at 8:00 am. Saturday morning. All SystemsGo personnel and schools will be headed out to the range at 5:00 am.

Event details will continue to be available here. I will provide information each day as to how the schedule and other event details went for that day and how launches transpired. Pictures are not allowed on the range, so very few will be available. If anything is available I will post it for your viewing pleasure. Tomorrow should wrap up our launches for t his year.

If we are lucky and things go perfect and we leave the range early their may be dune sledding in tomorrow evening’s future. And Sunday we will all be heading home.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org. Take the time to get your school involved, the future of your students will be greatly benefited.

#Rockets2026 #SystemsGo #RideTheSky #Texasrockettrail #WSMRRocketLaunch2026 #EyesOnThe Sky #EyesToTheSkies #ItIsRocketScience

Published by

Unknown's avatar

gigijb

I am a native born Texas Hill Country woman of German Texan descent.

Leave a comment