Goddard Level Rockets Ride The Skies in 17 Days Redbird #20 Among Them

The Goddard level rockets, which are the capstones of the SystemsGo program and the culmination of all the skills the students have learned throughout their years in the STEM program are set to launch June 21-23. This marks the final senior project for the schools that participate in this level of the SystemsGo program.

Redbird #20 is scheduled for testing at White Sands Missile Range (WSMR) Sunday, June 23. This marks the last big event for Rockets 2019 and the Fredericksburg Engineering/Rocket Program.

As of today, May 31, when I was able to get a report on the rocket’s status, from team member, Dawsen Harkins, was in good standing. He reported that as of May 30, the nosecone had been assembled and covered with its first layer of fiberglass.

In this photo the nose cone ring is being secured in place, and centered by skewers for fiberglassing.

Although, the tank required 2 trips to SRM to have leaks rewelded, it has now completed its pressure testing successfully. It will be returning to SRM again to have the hatches and holes cut in.

New for this year is a piston valve system. This has also performed well when tested.

This year’s rocket is supporting three payloads. The first came from Harvard University, courtesy of former FHS student, Joseph Sanchez, who attends school there. It is a CubeSat with a pneumatically deployed solar panel.

They second one was created by Keith Jenkins, the FHS IT guy. It is a small electronics bay.

The third the team provided. It is a GoPro camera. It will be positioned behind an acrylic window in the hatch, so that it can look out and video the vehicle’s flight.

According to Harkins, “All components bays have been made and 3D printed and fit perfectly in the rocket.”

The fuel grain is also on the task list. They have assembled the mold for pouring it. One part of the mixture for the fuel grain is still not in but they will be mixing and pouring it as soon as this arrives.

As of this report, supplied last Friday, the following list of things is left and then they are FRR complete.

  1. Complete the fiberglassing of the nose cone.
  2. Make the fuel grain and assemble the motor system.
  3. Assemble the recovery system.
  4. Weld fins to body.
  5. Cut hatches and have holes drilled in the body tube.
  6. Fix minor little things for flight.

The current list of students from this team attending the WSMR launch is as follows:

Rodolfo Avila, Cody Blohm, Gloria Burns, Alexander Casteneda, Lucio Castro Vazquez, Clayton Ellebracht, Jose Escalante, Jabin Gipson, Dawsen Harkins, Cooper McDonald, Eduardo Memije, Bradley Plaza, Joshua Reese-Hadley,  Nicholas Rodriguez, Robert Sanchez, Deja Turkett, Gabriel Voorhees, Carl Wilger, and Robert Zowie.

Currently there is not a team picture available, but here is Nick Rodriguez, Deja Turkett and Dawsen Harkins taking a work break on the stairs at FHS.

Launches are scheduled for June 21st and June 23rd. The team will travel out to WSMR on Wednesday, June 20th, and back home again on the 24th.

There are 7 schools scheduled to launch 8 rockets. These schools include:

  • Alamo Heights
  • Anahuac
  • Booker T. Washington
  • Brazoswood
  • Fredericksburg
  • Marble Falls
  • Union Grove

The current launch schedule is as follows:

  • Thursday, June 2oth
    1. Travel Day
  • Friday, June 21st
    1. Mrorning-T-1/Site Set up WC-50; Afternoon-Launch Union Grove & Alamo Heights ( or whichever rockets are ready)
  • Saturday, June 22rd
    1. Launch Day Two (Four Rockets-Booker T., Anahuac, Marble Falls, & Brazoswood)
  • Sunday, June 23rd
    1. Launch Day Two (Two Rockets-Fredericksburg & Booker T Washington)
  • Monday, June 24th
    1. Travel Day (Could travel home on the 23rd if operations are complete in time.)

This article is for the 2018/2019 school year to update the Fredericksburg Engineering/Rocket program. This school is a participant of the SystemsGo STEM program. This series of articles is intended to support and encourage students in the program as they share their working status and accomplishments throughout the year in the program. These publications will be available for tags and re-posting.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be greatly benefited.

#Rockets2018 #SystemsGo #FredricksburgSTEMAcademy #Launcher01 #RideTheSky #Texasrockettrail

 

Fredericksburg’s Engineering/Rocket Program-Rockets 2018 Willow City Launch Week Pre-Launch Update

Today is Wednesday, April 25, and the juniors are a day away from testing their vehicle at Stewart’s Hillview Ranch in Willow City at Rockets 2018. They will be launching on Thursday, but the time will be determined on site. Also, this year the larger class volume meant two teams and two rockets.

According to Mr. Matthes, Engineering Instructor, both teams finished both rockets on time this year. They were due by the end of class, last Thursday. Both teams made use of the after school hours requirement in order to finish, with a couple of students stretching that to midnight in order to complete the work.

As of Monday, both vehicles were described as being in good shape by Mr. Matthes, with the only issue still in play, attempting to lighten the weight in order to increase speed.

Aside from that, Mr. Matthes had this to say about the upcoming launch, ” I do not rubber stamp any rocket.  Failure is an option in the program as it is in life.  If the students have a rocket that passes inspection, goes to the pad and gets tested they are successful…but the rocket can still fail.  The existence of uncertainty is partly why the students are so invested in their rocket.  It is because it is their solution without guarantee of meeting the project’s objective.  They’ve poured their hearts into this project for five months and will get to see their ‘babies’ launch, just as parents hope to see the fruits of their parenting, without guarantees of outcome, launch their children into life.  This is an inherent part of research.  Paramount though is the fact that true failure only occurs if the process stops and lessons are not learned in the process.”

He also commented that he had seen GREAT looking rockets fail so he’s reticent about getting the students’ hopes up too much.  And on the flip side, I  have seen some rockets that I thought for sure would fall apart on the way down to the pad, and they amazed us all.

Flight Readiness Reviews(FRRs) were due by the end of class on yesterday, Tuesday. One team completed by the bell, but the other will be capping off at the beginning of class on Wednesday.

 Robert Sanchez and Esten Cooke with their vehicle.

 Pictured here are Ander Castaneda, Dawson Harkins, Cody Blohm, Deja Turkett, Cooper McDonald, Josh Handley, Gloria Burns, and Ethan Scott.

 Team members Robert Sanchez and Gloria Burns.

Pictures provided by Katie Burns.

Some juniors and seniors will have an opportunity to work at the launch pads during the event.  This affords them the chance to get experience prepping the rockets for flight and getting closer to the action. This is a privilege typically reserved only for seniors.

Unfortunately I was unable to obtain a picture and Team name from Team 1.

Pictured below is Team 2 with their rocket.

Meusebach (Team 2): Clockwise from #1 at the bottom. Cooper McDonald, Cody Blohm, Ander Castaneda, Deja Turkett, Josh Handley, Gloria Burns, Robert Zowie, Eduardo Memije, Ethan Scott, Dawson Harkins, and Rudy Avila show off their rocket just after completion last Wednesday evening, April 18th.

If you plan to attend any of this year’s launches please register for your attendance ticket at https://www.greateventseats.com/SystemsGo or they may be gotten at the gate. These are free but required for admittance to each site.  Reserving them ahead at the website is preferred to obtaining them at the gate because the latter slows entrance to the site and may result in you missing the viewing of your intended launch.

You may also view any of these launches on Livestream. That link is available on the SystemsGo or at the following link from them: Here is the link to the live stream again. https://livestream.com/systemsgo

The launch schedules for each venue are available at http://www.systemsgo.org/events/ . I will post it here for each launch day as well. I want it to be as accurate as possible so I will refrain from posting schedules until the evening before each launch day in case there are any late changes.

Here is a PDF  map link and Google graphic map link to the site. These links are available on the SystemsGo web site as well.

Please watch the SystemsGo website, SystemsGo Facebook page: https://www.facebook.com/pg/SystemsGoEducation/posts/?ref=notif ,  SystemsGo Twitter feed: https://twitter.com/SystemsGoNews and this blog for upcoming information on these events.

This article is the fifth in a series, new for this school year ’17/’18 of updates that will follow the Fredericksburg STEM Academy/Rocket program. This school is a participant of the SystemsGo STEM program. This series of articles is intended to support, encourage, and challenge students in the program as they share their working status and accomplishments throughout the year in the program. These publications will be available for tags and re-posting.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org . Take the time to get your school involved, the future of your students will be greatly benefited.

#RideTheSky #Rockets2018 #SystemsGo #FredricksburgEngineeringRocketProgram #Launcher01

Fredericksburg’s Engineering Rocket Program-Second Term Update #2 (February 16-April 13)

It is April and we have some catching up to do on the  FHS Engineering program. It has been two months since our last update and quite a bit has been happening on all levels.  Along with class work, launches start this month in Jal, New Mexico  on April 21 and Fredericksburg (Willow City) April 26-28 so time is becoming a factor for the Junior and senior groups.  Each group is working hard to meet their timelines. Rockets 2018 is the pinnacle event for the upper level groups, as their rocket projects are basically the final grade for the year.

The seniors have approximately 73 days until Redbird 19 is TENTATIVELY scheduled for testing at White Sands Missile Range, which is usually in the last week of June.  This date is still not a permanent date until the Army finalizes, closer to that time. Mr. Matthes will announce that date when it becomes readily available. Their completion date for  preliminary systems tests is usually two weeks before school ends. This would be May 18 which cuts them down to 59 days.

More on these groups and their current status reports will be later in the article.

Freshman participated in a field trip on March 1st, in which they visited Southwest Research Institute(SwRI), the Center for the Intrepid,  and the UTSA VIZlab.  At the Center for the Intrepid, the students were able to see biomedical equipment at work helping wounded Veterans in their recovery. Along with the engineering aspect of this, Mr. Matthes hoped that they took away a new respect for our military servicemen and women and the full extent of the sacrifices they make each day for our country’s safety.

Former FHS Engineering Alumni, Drake Horstman, was the students’ guide when they visited the UTSA VIZlab, toured the campus, engineering lab and community areas. During the visit, Drake, provided  entertainment and wisdom coupled with numerous stories about his experiences in the FHS Engineering Program. Inside the lab, the students were able to see several visual interaction devices.

At Southwest Research Institute, students learned technical information about engines, modifications and fuel efficiency. The content here was a little over their knowledge base,  and may have overwhelmed the students a little, according to Mr. Matthes. In spite of that, it was still a good visit for the students, and the coordinator at SwRI commented  about their behavior stating, “they are better than a lot of the college students who come through.”

These visits are designed to expose the students to different aspects in the engineering fields. The impressions they take from here will help them make decisions down the road on whether engineering is for them, and if so, help them determine a particular area of interest.

The Freshmen also participated in their first Critical Design Review (CDR). They were tasked with presenting solutions to fix the damaged launch tower for the Red Bird rockets. This gives them practice on presentation skills and feedback on designs for their project.

Mr. Matthes stated that, “the students may have felt “roasted” with constructive criticism and feedback. But, that they should know, that it is part of improvement and growth of design and not personal.” He mentioned that this was also discussed briefly at the end of the trip to SwRI, by the hosting engineer.

The sophomores have advanced well in the curriculum and are presently several weeks ahead of their  current deadlines. Their current focus is on dimensioning objects, denoting measurements and creating fabrication notes. Due to this, their proficiency has advanced well.

Mr. Matthes is quite impressed with the Juniors selection of a class name. Here is how he describes it,”The juniors named their class “Conatus” which translates from Latin, to impulse and means striving.  From a historical philosophy origin it relates to the nature of something to continue its existence.”

The pressure is on with an April 19th rocket completion date looming ever closer. The rocket must be completed one week prior to their April 26th launch, because after it is completed they must also complete a Flight Readiness Review which often uncovers errors and problems that must be resolved.  This week provides adequate time for those things to happen.

According to Mr. Matthes neither team has anything that quite resembles a rocket as of yet, but each is working through a pile of parts that arrived. Most were not ordered until the end of March which was quite late, but each group began working with tangible parts  the end of last week.

Team #2 decided to make use of Monday’s teacher in-service day, by putting in about four hours of work. Shown below from team #2 are clockwise starting from the bottom, Cooper McDonald, Gloria Burns, Ethan Scott, and Dawson Harkins as they take measurements off the back-end of the rocket and motor system.

Both teams do have a work in progress at this point.  According to Mr. Matthes, “Pressure makes diamonds and rockets.”

Incidentally, another incentive for each comes from SystemsGo. A flawless flight and perfect recovery may afford that team the chance to re-fly their vehicle with a different fuel grain in order to collect data for SystemsGo.

The miniature Teststand is an ongoing project for the juniors as well. They are using LabVIEW programming as a means to start ignition and measure thrust, as well as using 3D modeling in order to develop a unique physical Teststand model. The class is split into working groups of 3. According to Mr. Matthes, “They are on track to have this done by the end of school and I am excited to see what they come up with.”

Seniors are progressing well with Redbird 19, wind tunnel and the large Teststand development.

Construction is beginning on Redbird 19 now that parts are returning from Heartland Enterprises. According to Mr. Matthes the parts, “look beautiful, and most parts are in.” Now that parts are available there is a bullet list of accomplishments to be achieved including, overlaying the nose cone in fiberglass, creating a mold and then pouring the fuel grain, making a custom hose for the injection valve, testing  recovery chute deployment, integrating avionics into the vehicle, and Mr. Jenkins is in the process of manufacturing the payload.

Here Harrison Spisak, Bryce Erwin, and Sergio Walle are checking the fit of the injector, nozzle and retaining ring in their fuel grain liner.

Currently wind tunnel is well underway, as students are receiving and ordering parts. The program is nearing completion and the electronics used for the drag testing measurement has arrived. Hunter Smith, a SpaceX programmer at the McGregor facility has been assisting Rebecca Sechrist through a Skype session. He has been providing analysis and comprehension in areas he has already assisted, as well as a starting point from which to move ahead. According to Mr. Matthes, “The students are making headway but must begin to make a push in order to finish this outstanding design by summer.”

Deadlines are quickly evolving for Teststand, as the group’s progress here is steady but slow. They have installed a flow meter to directly measure Nitrous oxide. Load cells which measure thrust have been changed out and fuel grains have also been readied for testing.

The stand itself is nearing a test ready state. New to this year’s stand are changes in the injection system. The new system will allow more controls of the flow. A parent plate has been designed by students and fabricated by another local machine shop, Kager Industries,  which will hold a smaller injection disc allowing students the ability to change out the disc which controls the rate of flow. The plate can be installed as soon as the 0.05″ holes have been drilled through. Next, the LabVIEW program will be fully tested on the stand.  Afterwards, a cold flow test will be conducted in order to measure the oxidizer flow rate and determine if the size and pattern of holes in the new disc are correct. If the cold flow tests are successful, then hot fire tests can begin.

The Baby Bird Teststand is still on hold until further notice.

SystemsGo hosted a BBQ dinner event for the neighbors in Willow City. Seniors, Bryce Erwin and Sergio Walle, pictured below,  spoke at the event. Their purpose was to educate attendees about the educational process of the program and how it relates to the upcoming launches, as well as to share their own experiences in the program.

Additionally, Harrison Spisak and Corbin Smajstrala spoke to the Morning Rotary last month on similar subjects.

Mr. Matthes would personally like to thank all four of these young men for committing to these events and participating in them. In both cases, participants and SystmesGo staff commended them on their exceptional performances.

This article is the fourth for the 2017/2018 school year in a series of periodic updates that will follow the Fredericksburg Engineering/Rocket program. This school is a participant of the SystemsGo STEM program. This series of articles is intended to support and encourage students in the program as they share their working status and accomplishments throughout the year in the program. These publications will be available for tags and re-posting.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org . Take the time to get your school involved, the future of your students will be greatly benefited.