Tuesay, First Launch Day at WSMR

Today was a great success for the SystemsGo program as they met and/ or exceeded three T times with three rockets off the rails. The action started off well with a T time of 8:30 a.m. for Alamo Heights Heights School. They began the day with their smaller rocket built for extra height. It left the rail well, had a beautiful flight and reached a total height of 10086′. At this point the paper phenolic cover around the fuel grain burned off causing the body tube to melt through developing a hole with a side burn after which it rolled over and returned to the range in a ballistic fall. Reports from WSMR have it plugged into the range 970′ from the launch site in lawn dart fashion. This was not totally unexpected since a recovery system was not part of the vehicle.

The 11:00 a.m. T time for Union Grove’s launch meant that SystemsGo had to load the vehicle on the rail, fill and be ready to fire within two and a half hours. This was met and exceeded as their rocket left the rail at 10:59. The rocket had a great lift off but not far into the flight, the engine case blew apart dumping the motor and fuel grain. Preliminary reports are that the nozzle came off causing engine explosion. Their nose cone and shoot deployed, but the shoot did not open. Their max height was 600′.  This was actually the first time that Union Grove High School has left the rail in what is now their third attempt at WSMR. This is a great triumph for them. They are now their school’s first flight at WSMR.  Great job, Union Grove students.

Alamo Heights had a second rocket launch today with a T time of 2:00 p.m. SystemsGo did great work and exceeded this sending them off the rail at 1:48. This rocket only made 180′ after clearing the rail. The same paper phenolic fuel grain cover caused a hole to melt through the rocket at which point it began tumbling end over end back to the range.

Congratulations to both schools, at having achieved getting a rocket off the rail at WSMR. Post Flight Analysis on all these vehicles should prove to be enlightening and educational.

Tomorrow’s schedule is tentative because at this point the scheduled schools’ rockets are not pad ready. They are all going out to the range at 5:00 a.m. to complete work on them and hopefully keep the tight schedule for the day. The following is the schedule at this time:

Wednesday launch order:

  • 8:30 a.m. Anahuac
  • 11:00 a.m. Booker T. Washington (1)
  • 2:00 p.m. Booker T. Washington (2)

Event details will continue to be available here. I will provide more information each morning as to how the schedule and other event details will progress for that day and how launches went for the schools testing that day. Pictures are not allowed on the range, but some pictures of teams getting ready to leave for the range with their vehicles might be available. If anything is available I will post it for your viewing pleasure.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be greatly benefited.

The picture was provided by parent, Lori Davis of the Union Grove High School Rocket team after their launch here at WSMR.

Monday, T-1 Briefing and Set up Day at WSMR Results in Slight Schedule Change

SystemsGo and the participating schools had a productive first day at White Sands Missile Range (WSMR) today. They started the day with the T-1 Briefing. This is basically WSMR rules and regulations for the range. It covers all basic information such as weather conditions, wind speeds, airspace schedules and logistics.

WSMR personnel made introductions so all involved would know who they are and who to contact for help from the base. After the T-1 brief they teased that it was the “dumbed down” version for civilians. At the end Scott Netherland introduced the SystemsGo team and specified their roles with the organization.

By 10:30 they were headed down range to West Center 50 launch site. This is where the schools, SystemsGo, and WSMR personnel spent the afternoon getting ready for tomorrow’s launches. All equipment and rockets had to be set up and completed to meet the Tuesday testing schedule. Everything went well and it was a very productive day albeit a little long and quite hot.

Union Grove had a small problem with their vehicle that kept it from passing the pressure tests so in order to be sure that the schedule would stay on course tomorrow, they moved  Alamo Height’s smaller rocket into the first launch window for tomorrow morning, because they had to have one on the rail and ready tonight to keep the schedule. Union was able to fix their problem and pass the second round of pressure tests so they will resume as the second launch in the morning.

Because of this tomorrow launch schedule is as follows:

  • 8:30 a.m. Alamo Heights High School (1)
  • 11:00 a.m. Union Grove High School
  • 3:00 p.m. Alamo Heights High School (2)

Due to the 8:30 T time tomorrow will be an early day for SystemsGo team and schools. They will be leaving for the range by 5:30 a.m. Alamo Heights parents going to Range Control to view the launches will be leaving at 6:15 a.m. Subsequently parents with Union Grove will be heading to Range Control by 9:00 a.m.

If it is a perfect day and all goes well with no exceptions with each launch, then the tests should be complete by 3:00 p.m. Realistically this is a very tight launch sequence with little to no room for errors. As long as each rocket that loads the rail leaves without any issues at ignition this schedule will hold and therefore the next days will follow as currently scheduled. If one vehicle has to be taken down from the rail then the next launch window will be lost and the schedule will have to shift.

Therefore let us all hope and pray for the best for each school so that they may have a successful launch tomorrow and that all schedules hold true.

Here is the current preview of the launches scheduled for Wednesday. Tomorrow’s blog will have a final schedule for the day based on Tuesday’s test success.

  • Wednesday launch order: Anahuac, Booker T. Washington (1), Booker T. Washington (2)

Event details will continue to be available here. I will provide more information each morning as to how the schedule and other event details will progress for that day and how launches went for the schools testing that day. Pictures are not allowed on the range, but some pictures of teams getting ready to leave for the range with their vehicles might be available. If anything is available I will post it for your viewing pleasure.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be greatly benefited.

Sunday Rockets Headed to White Sands-Day 1-Report and Monday Early Information

The SystemsGo team rolled out of Fredericksburg at just before 9:00 a.m. this morning to head out to White Sands Missile Range (WSMR) in New Mexico and arrived at Alamogordo around 5:30 this evening. Travel went well, and two schools, Alamo Heights and Booker T. Washington met us there.

Tomorrow is an informational and set up day. SystemsGo personnel and only student and teacher participants from the schools head out at 6:00 a.m. for T-1 briefing  and afterwards setup at West Center 50 launch site.

Event details will continue to be available here. I will provide more information each morning as to how the schedule and other event details will progress for that day and how launches went for the schools testing the previous day. Pictures are not allowed on the range, but some pictures of teams getting ready to leave for the range with their vehicles might be available. If anything is available I will post it for your viewing pleasure.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be greatly benefited.

Team photo includes from left to right, Ginger Burow, Scott Netherland, Randy Kuhlmann, Steve Burow, Brian Heffner, Gene Garrett, Andrew Matthes ,Rebecca Hyatt, and Josh Hampton. Not available for this picture, Chelsea Burow.

2 More Days- Here’s What’s Happening for WSMR

The SystemsGo team and schools leave for New Mexico to launch rockets at White Sands Missile Range (WSMR) on Sunday, June 26. That is two days from today. The list and schedules have been finalized and packing is underway.

The schedule will proceed as follows:

  • Sunday will be their travel day to Alamogordo, NM to the hotel.
  • Monday morning will be T-1 briefing
  • Monday afternoon they will travel to West Center 50 Range and do site set up and rocket prep
  • Tuesday launch order: Union Grove, Alamo Heights (1), Alamo Heights(2)
  • Wednesday launch order: Anahuac, Booker T. Washington (1), Booker T. Washington (2)
  • Thursday launch order: Fredericksburg, Make up #1, Make up #2
  • Friday will be travel back home for each group.
  • If for any reason tests run late on Tuesday and Fredericksburg is delayed then they will shift to first on Wednesday and subsequent launches will shift as needed.

The final list of schools participating in this year’s WSMR tests is:

  • Alamo Heights High School
  • Anahuac High School
  • Booker T. Washington High School
  • Fredericksburg High School
  • Union Grove High School

Parents be sure your child and yourselves if you are already on the approved list with SystemsGo, and attending, has proper identification with them. State driver’s license, federal pass port, or state id card are required for access to the base. Also be sure they have medical insurance information with them in case of an emergency.

Please be advised that WSMR is an Army base and does not allow spectators in to view these launches. Only the students, personnel, and parents who have been previously approved through SystmsGo and added to the list may enter the base with the group. Please do not drive to White Sands and attempt to enter on your own, or expect to do so with the group, because you will be turned away.

Event details will continue to be available here. I will provide information as made available to me from team members on site as to how launches have gone for those schools testing on that particular day. Pictures are not allowed on the range, but some pictures of teams getting ready to leave for the range with their vehicles might be available. If anything is available and passed on, I will post it for your viewing pleasure.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be greatly benefited.

WSMR Report-17 More Days

Today marks 17 days until the SystemsGo team and schools head to New Mexico to launch rockets at White Sands Missile Range (WSMR). Already the schedule has changed since this time last week. Luckily the dates haven’t changed only brought the return date to Friday now instead of Saturday.

The classified tests WSMR had scheduled for Wednesday have been canceled allowing launches to continue on Wednesday instead of having a down day on that date. Sorry folks, that means no scheduled sight-seeing after all, but at least you will be home with more of your July 4th weekend in tact for fun.

I will not be posting the actual launch schedule for the schools until next week once we are positive there are no more changes and all schools slated to go are on board for sure. Fredericksburg is still feverishly working on the completion of their rocket. At this point no other schools on the list have given indication that any critical problems could cause them to abort.

Parents if you will be joining your child on this trip, and if they have a vehicle to launch, then you should be, then please get your identifying information in to your child’s teacher immediately. Only those on the list with information in ahead of time will be allowed on the base to observe the launches. Do not miss out on this it is definitely a trip in which you should participate.

Event details will continue to be available here. As schools and schedules finalize I will provide an updated list of  those schools traveling to WSMR and the launch schedule. The week of the launches I will provide information as made available to me from team members on site as to how launches have  gone for those schools testing on that particular day. Pictures are not allowed on the range, but maybe some pictures of teams getting ready to leave for the range with their vehicles might be available. If anything is available and passed on, I will post it for your viewing pleasure.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be greatly benefited.

WSMR Rocket Launches Fast Approaching

The SystemsGo Rocket program now transitions to Goddard level rockets. These rockets and their subsequent launches at WSMR (White Sands Missile Range) are the culmination of all the skills the students have learned throughout their years in the STEM program. This is the final senior project for those schools that participate in this level of the SystemsGo program.

Launches are scheduled for June 27 through July 1. The group will travel out to WSMR on Sunday, June 26, and back home again on Saturday, July 2.

These launches have been anywhere from June to mid August in past years, with multiple rescheduling happening all the way up to time to leave because of Army necessity. Actually having a fairly concrete date this year means students have to be on their game and get their vehicles completed on a tight schedule. According to Fredericksburg’s STEM teacher, Andrew Matthes, their group has a deadline of today, Friday, June 10 to have their rocket completed and ready to travel. Other schools involved most likely have similar dead lines.

As of Wednesday, June 1, the class was reported by Mr. Matthes to be on schedule with final modifications being made in all areas, including the following:

  • The after section for the motor is at Rode’s Welding for attachment to the 10′ long Nitrous tank
  • Avionics is installing the payload in the forward skirt
  • Propulsion has had a successful pour of their HTPB fuel grain, and is now working on the fuel canister
  • Nose cone is completing the shoulder part which sticks into the airframe of the rocket
  • Fins are in the attachment stage of the aft motor section

Notice in the above list, that Rode’s Welding is mentioned. Part of the skills learned in this program is when and where to contract other professionals to finish a component. Most of the components of this vehicle are finished by the students, but when there is an area that requires a more professional skill base, the students have to know how to draw out specific design models and calculations and present them to a welder, machinist or other entity so that they are created according to the design they have drawn out for the completed vehicle.

There are 5 schools scheduled to launch 6 for sure, possibly 7 rockets. These schools include:

  • Alamo Heights (2)
  • Anahuac (1)
  • Booker T. Washington (1 for sure, possibly 2)
  • Fredericksburg (1)
  • Union Grove (1)

This year is unique in that the Army has some classified tests scheduled that involve the range (West Center 50), SystemsGo uses to launch. Therefore, instead of launching straight through and then leaving, there will be a break in the schedule on Wednesday, when the group will not be allowed access to the range. SystemsGo is looking into activities for the group to do on that open day.

When I checked in with Mr. Matthes and his class on their project status, this was the enthusiastic response they delivered.

Jacob Eckhardt, “We are cutting it close but we’re working on getting it done, full force.”

Mr. Matthes added, “with reduced workforce.”

This is a common malady of the program for the senior group. After school lets out it is  hard to keep them focused, but there is always a dedicated contingency of the team that usually stays on point and gets the vehicle completed and off to WSMR.  This is just a hazard of the launches being a summer trip after graduation. Even with this, 95% of the time, the project makes it to White Sands.

Today is 23 days out until the group leaves for WSMR. Watch this blog in upcoming weeks for more information and a launch schedule to be posted.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be greatly benefited.

 

 

 

Fredericksburg Rockets 2016-Thursday Day 1 Report & Friday Schedule

Thursday went well. It started off a little slow due to a rain delay and low ceiling. Fortunately, it burned off by lunch time and launches started lining up quickly.  We had a little issue with  quite a few coming down ballistic so that made recovery difficult on some where there wasn’t much visual or tracking. All in all we still had an 80% recovery rate with only 4 left in the field. Hopefully they will still be recovered before the end of the weekend.

This year is a special treat for us. We have a third party in our recovery team. Our Navy daughter is home on leave, and joined us to work recovery. We had a real good time. There was a lot of goofing around during breaks in the action. Her dad and her were quite entertaining to watch as they had plant war, trying to pelt each other with beggers lice bushes, and other burr covered plants.

Once again SystemsGo has a truly talented group of team members and volunteers that put full effort into a great experience for all the students involved.

We have a shadow group from New Mexico this year. They have recently come online with the program and are helping in all areas to try to learn and mimic what we do here in order to  replicate it in New Mexico starting next year. Here’s a great shout out to them and their group, it is wonderful to have them here and on board with SystemsGo.

Below is the launch schedule for tomorrow, Friday. There are 8 schools launching a total of 25 rockets tomorrow.

Friday, May 13, 2016
School
Name
# 1st Level
Tsiolkovsky
# 2nd Level
Oberth
Akins High School
John Sayce
6
Fabens High School
Manny Moreno
3 1
Hardin-Jefferson High School
Mike Fogo
2 1
Hollenstein Career & Tech Center
Richard Griffith
2 2
Maypearl High School
James Herrod
1
McGregor High School
Chris Kuhl
1 1
Tom Moore (Ingram) High School
David Bunch
2
Union Grove High School
Greg Park
2 1
Schools Launching  8
Totals 19 6
May 13th Total Rockets 25

The following is a link to the album of pictures from today’s launch. Have a look you and your school rocket just might be in there.

https://www.facebook.com/ginger.burow/media_set?set=a.1137664469588016.1073741862.100000334203350&type=3

 

Good luck to all the schools launching on Friday. If I get a chance to do some updates during the day tomorrow , then I will but don’t count on it. It will probably just be one at the end of day. Here is the link to the live stream again.

http://livestream.com/accounts/3165037/events/5367166

Please remember that although there is no charge for the event, and these launches are open to public viewing, parking and seating is limited due to safety requirements. For this reason, SystemsGo has a provided a link for you to pre-order tickets for those in your party. This also provides SystemsGo with a way to monitor the number of people in attendance each year. This is in no way meant to discourage your attendance, but is instead to help them provide a great experience for students and spectators, while doing all possible to monitor safety issues and attendance numbers  at any one time during the launches.

https://www.greateventseats.com/events.php?lID=92

Event details will be available here each day of the event. Daily reports featuring schedules, school names, results, pictures and some editorial content will also be posted.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be greatly benefited.

Day 61-Rockets at WSMR-Final Launch Day-Update

Today was the final launch day at WSMR for this year’s participating schools. Alamo Heights High School was scheduled for launches of two separate rockets today, one that they were unable to launch while at WSMR last year, and a new one from this year’s class. Union Grove was on standby for a second attempt if time permitted.

The SystemsGo team and the high schools had another early start to the day arriving at WSMR at 0400, with an eight hour window for launches. Transition times between launches were running at two hours each, which allowed all three launch attempts to be completed quickly, everything to be packed up, and the group off the range by 1800.

Alamo Heights started off with their new rocket at the pad. They had a successful fill, fire, and launch. The vehicle climaxed at 17,000 feet, and then nosed over and came down ballistic. What was recovered from it was in pieces.

Alamo Height second rocket, the return from last year took the pad next. It too had a successful fill, fire, and launch, leaving the pad behind and reaching an altitude of 34,000 feet. This rocket also came down ballistic, and they were only able to recover the motor section.

Union Grove was able to attempt a second launch. They had a successful fill, which ended in a vehicle malfunction that caused the injector system to open but no ignition. Speculation is that the Estes motor inside with the electric match did not light because of a possible wire short in the rocket.

That concluded the launch series at WSMR for this year. To recap out of six vehicles, there were two successful launches each with failed recovery systems. One more low altitude launch with in flight mechanical failure causing premature landing and continued burn out. One complete hang fire on the rail. And two scratched due to vehicle malfunctions at fill.

Congratulations to all five schools for getting this far. There are schools every year that aspire to be here, and do not make it. You have accomplished a great deal. You have all met the objective of the program which is to create a scratch built rocket, have it completed and ready for flight, and on the rail attempting launch at White Sands Missile Range. The goal of flight, may have been elusive, or perhaps achieved but still problematic, but you made it here, and each of you has something to learn from the event and some will have the chance to study, fix and try again. All of you are in an elite group of past and present students that attempted to launch a rocket at WSMR.

Tomorrow is another long day of travel as the SystemsGo team and participating schools all head back to Texas. Hopefully it will be a safe, smooth trip home without any issues.

That concludes Wednesday’s WSMR Rocket update.

www.systemsgo.org as always is the place for more information on this program. Take the time to get your school involved, the future of your students will be greatly benefited. SystemsGo is a Texas-based STEM curriculum program.

Tune in again tomorrow for an update from Thursday’s trip home from White Sands Missile Range this week.

 

Day 60- Rockets at WSMR- Launch Day 2-Update

This morning started around 0900 on WC 50 range at WSMR. Earlier start was not available due to actual military testing scheduled for today. Two schools, Union Grove and Booker T Washington were on the schedule with a 6 hour window for completion.

The SystemsGo team spent the first hour plus, conducting readiness checks on the Nitrous tanks making sure they were switched out for full ones, making sure the Pad was completely operational, and safety testing the Fill and Fire system to be sure it continued at 100%. During this time, students evaluated their rocket and checked to be sure their vehicle was completely prepared for launch.

Between 1030 and 1100 all systems were deemed ready as was Union Grove’s rocket so it was moved to the launch rail. It went vertical around 1145 and commenced fill. As the third Nitrous tank was filling into the rocket, a small piece at the top of the Estes motor in the injection system froze, and collapsed causing Nitrous to vent. At this point the launch had to abort. The problem was easily fixed and the rocket was readied for a second attempt after Union Grove if time allowed.

It took approximately two hours to remove Union Grove’s rocket and put Booker T Washington’s rocket  on the rail, switch out Nitrous tanks, and wait on the survey teams to provide a new azimuth and angel for the rail for the new launch. During this time another thunderstorm was fast approaching. At 1420 they began fill, as the third tank was loading the Army reported lightning ten miles out. Fill was completed and the rocket was ready to fire so the teams all went to the bunk house and began countdown. Twelve seconds from launch the Army called abort due too high winds that would have affected the rocket’s projections.  After another 45 minutes to one hour, they were given the go for launch again and restarted the countdown at one minute and 30 seconds (90 seconds). Rain continued throughout this time.

The initial launch went well. The rocket ignited and left the rail. It traveled 30 to 40 feet up where the bolts at the top of the nozzle cracked, the rocket lost control, and nose-dived into the range between 180 to 200 feet from the launch rail. It continued burning on the ground, and continued storming so it was allowed to stay where it was and burn out. The Army took over monitoring it until they deemed it safe to approach.

This rocket was caring a NASA payload in the form of a container that was filled with lava rocks meant to represent moon rocks. The purpose of the payload was to test the container and evaluate how it would hold up to space flight and impact at  landing. The container was crushed and the rocks strewn all over the crash site. It was determined that the container would not hold up as part of the nose cone.

The decision to abort for the day was made because of continued heavy rain, lightning, and wind in the storm. Two hours elapsed before the storm let up and they were able to get out on the range, retrieve the rocket and rocks, and pack up for the day. This also meant that Union Grove would not get another shot at launch for today, bumping them to after Alamo Heights tomorrow time permitting.

On another outstanding note, the new Fill and Fire system has been tested and found 100% operational in sunshine or rain. Congratulations to Robert Dever, the system designer.

Wednesday’s schedule includes two vehicles for Alamo Heights High School and now a second attempt for Union Grove if the window of opportunity is still available. Range time begins at 0400 with a final eight-hour window. Launch times begin at 0800.

After launches are complete, the team will pack up all equipment and clean up the site, and the schools will load all vehicles, clean up and take down all staging areas including tents and materials and return the bunk house and  pad to pre-SystemsGo arrival WSMR standards.

Thursday all SystemsGo teams and participating schools will return home.

That concludes Tuesday’s WSMR Rocket update.

www.systemsgo.org as always is the place for more information on this program. Take the time to get your school involved, the future of your students will be greatly benefited. SystemsGo is a Texas-based STEM curriculum program.

Tune in again tomorrow for an update from Wednesday’s final day of  launches at White Sands Missile Range this week.

 

 

 

Day 59-Rockets at WSMR -Launch Day 1-Update

Monday was another long day for the SystemsGo team, students from Marble Falls and Anahuac High Schools, and WSMR officials as they commenced the first day of tests.  Start time on the range at 0400 was with no electricity due to lightning strikes the evening before, but this was quickly corrected.

The Fill and Fire System completed set up with the addition of the Comm Readout Displays which allow the bunk house and the pad to see a digital readout of the temperature,  pressure, and weight for the vehicle on the pad during the launch preparation sequences. The full system was tested and minor glitches addressed which brought it to 100% working and readiness. Throughout the day the system was reported to work great and continued at 100%.

Marble Falls was originally scheduled to test a 0830, instead it made it to the pad at around 1200. The vehicle passed its final fill and fire tests and went vertical around 1230. The survey team set the angel at 85 degrees with an azimuth of 355. Six Nitrous bottles were loaded into the tank. At this point it almost over pressured and began to release venting liquid instead of gas. At 175 lbs and 900 PSI  the vehicle was determined ready for launch. Switches were good, and flame was good, but the injector failed to open and the rocket went into a still fire burn on the pad, continuing to burn for four minutes, until the bottom began leaking the nitrous.

Army rules forbid any contact during this time and for 30 minutes after the fire burned out. At that time the Oxidizer crew was allowed to approach and evaluate the vehicle. The rocket was too hot too touch delaying removal of it from the pad for another hour.

Minor damages were reported to the launch rail and trailer, but nothing that would affect or delay any future launches at this time. Instead it was just enough to give Captain Garrett something to do over the summer again.

At approximately 1400 Anahuac’s vehicle was brought to the pad and cleared for launch. At fill, one and a half bottles were loaded into the tank at which time it began leaking out from a vehicle malfunction, and Anahuac had to be scratched.

This concluded the tests for the day, setting today’s successful launch rate at zero. Any school that actually makes it this far is still a success for the simple fact that they attempted a launch of a vehicle of this size. They still have post analysis to do and challenges to over come to prevent these outcomes in the future.

Mother nature was reported to have attended the tests today as well and thrown her own challenges into the range for the crew to overcome, as well as find some humor in once they had passed. First a large dirt devil spawned right on top of the range and attempted to steal one of the large staging tents, causing a commotion as individuals scrambled after and reset it. Later, two birds were fighting on a transformer out by the pad, when a loud pop resounded, right after which one bird fell to the ground while the other made its escape and the power at the pad went down. Luckily they were using generators so this did not affect the pad and they continued as it was being fixed.

The crew spent fourteen hours at the range today, with an 8 hour launch window. Tomorrow they begin their day at 0900 with a shortened 6 hour launch window due to some other military tests scheduled for that morning early. Union Grove High School will be first followed by Booker T Washington High School. Both rockets are reported to be at 100% and waiting.

That concludes Monday’s WSMR Rocket update.

www.systemsgo.org as always is the place for more information on this program. Take the time to get your school involved, the future of your students will be greatly benefited. SystemsGo is a Texas-based STEM curriculum program.

Tune in again tomorrow for an update from Tuesday and a schedule of Wednesday’s launches at White Sands Missile Range this week.