Rockets 2022-Begins With Teacher Training

Rockets 2021 has barely ended as the Team and students returned home from launches at White Sands Missile Range in New Mexico, on June 27th, and July already starts a new year.

Rockets 2022 begins with SystemsGo Teacher Training for the 2021/2022 school year.  22 Schools from Texas, New Mexico, and Colorado will be participating in training on all levels of the program at locations in both Texas and New Mexico.

July 12-16 kicks off these educational events at the Goddard level. FHS Program teacher, Andrew Matthes, will conduct this event in the Fredericksburg High School Engineering Department classroom.


Five teachers from Texas high schools, including Birdville Career and Tech Center, RL Turner, Union Grove, Brazoswood, and Booker T Washington High Schools, and one from Jal High School in New Mexico will attend and secure certification to teach the curriculum at their respective schools this fall. This first week of training encompasses the senior level rockets which launch at White Sands Missile Range. It is the final and highest level of the program. These vehicles are designed to reach 50,000 feet.

July 19-23, four schools will train on the Tsiolkovsky level at Artesia Administration Building in Artesia, New Mexico. Canon City High School from Colorado, and Logan, Elida, and Animas High Schools all from New Mexico will all train with Program Director, Rebekah Hyatt.  These classes are designed for Sophomore, Junior and Senior grade students whose projects are generally one pound/one mile rockets for launch at one of the spring launches.

The following weekend, July 24-25, two teachers will train on the Oberth level also at the Artesia Administration Building in Artesia, New Mexico. One is from the West Texas school of Fabens and the other from Canon City in Colorado.  Regional Coordinator, Doug Underwood, will conduct these trainings. July 31- August 1 he will be in Fredericksburg training Texas teachers on this same level.  Hollenstein, Georgetown and McGregor High Schools will be in attendance in Fredericksburg.  This level teaches students in the Junior and Senior years on the Transonic rockets, which are designed to break the speed of sound.

The next week will be back at Fredericksburg High School, where Program Director, Rebekah Hyatt continues training teachers on the Tsiolkovsky level of rockets. The Texas schools of Summer Creek, Hollenstein, Friendswood, Atascocita, Galena Park, Georgetown, and McGregor will attend this session in Fredericksburg.

The first week in August, PD Hyatt will also be conducting webinars for teachers needing the Intro to Engineering training. These teachers generally work with eighth and ninth graders just starting in the program, which teaches the Research Design and Development Loop as well as the history and basics of rocketry. These are two hour working web trainings that are scheduled as needed. Currently there is only one on Wednesday, August 4th, but a second may be added later.

Covid caused many schools and teachers to drop the program last year. Fortunately, many are returning this year and at least five new schools have been added. SystemsGo is glad to see this uptick in the program.

The more schools and teachers mean many more students involved, and with that many more potential career paths in the STEM fields.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be greatly benefited.

#RideTheSky! #Rockets2022 RocketSeason!

Rockets 2021, Friday, New Sites for Stage 2 and Launch site

The SystemsGo team and schools headed out at 6:30 am. Friday morning, with their first stop as Alamogordo High School. They set up under a pavilion next to the athletic department, where they completed Stage 2 checks for each rocket. This was a new experience for the group since this activity usually takes place under tents on the range. 

IMG_1712

IMG_1753

Career Technical Education Coordinator, Manny Klaasen, was there point of contact and support at the school. Ironically, she is a native Texan from the Dallas area. She moved to New Mexico 20 years ago to teach at the college on base at WSMR, and then later took a teaching job in town at AHS. AHS is a participant in the SystemsGo program, but still in the early stages, and in need of a new teacher for the program. There current one left during Covid. She is super excited to see this level of the program and host the Stage 2 event. 

IMG_1750

At 10:30 am. the set up crew headed out to ABC-1 to begin preparations for tomorrow’s launches. Only SystemsGo pad crews went at this time to set up the pad, rails, fill and fire system, and all other pertinent equipment for launches. They were met and assisted by several WSMR range personnel.

A quick correction to my previous posts is that Booker T Washington High School, actually aborted last week, so that only leaves three high schools here at WSMR. Those include, Alamo Heights, Union Grove, and Brazoswood. All three completed Stage 2 checks and loaded up to go down range by 2:15 pm. They were lead in by the rest of the SystemsGo Team from Stage 2, and met at the Tula Gate by WSMR personnel. At the site they underwent Stage 3 checks and were loaded with charges for launch. 

Brazosport and Alamo Heights were the first to complete all checks. Because of this the new launch order for Saturday is as follows:

  • Brazosport
  • Alamo Heights
  • Union Grove

The first two were loaded on the rails this evening before the group left for the day. SystemsGo now has two launch rails and both will be in operation tomorrow. A rocket was loaded onto each and then they will be tested in sequence with only time out for safety; including the return of the launch team as they will be required to evacuate during each launch; and swapping gas and electrical connections between the rails.

WSMR pushed launches to Saturday only. With only three rockets this should not be a problem. Although the Covid restrictions do pose some extra time issues.

Launches are to commence at 8:00 am. Saturday morning. All SystemsGo personnel and schools will be headed out to the range at 5:00 am.

Brazoswood High School is first to launch and Alamo Heights is next on the second rail. After both launches, WSMR personnel will attempt to locate and retrieve the rockets for the students while the third rocket is loaded onto the rail. After the third launch we will be mission complete and pack all equipment. The first two schools may leave after their rocket has been returned to them, or WSMR has determined that it cannot be returned at this time.

Realistically, this is a very tight launch sequence with little to no room for errors. As we know, errors can and do occasionally happen and can cause severe delays in the launch schedule and hinder time availability.

If we do not get all three launches done tomorrow, then they will have to abort because we no longer have Sunday time slots as allowed by WSMR.

We also had two visitors from Space Port America here today to observe so they could get a more realistic idea of what the SystemsGo program does, it’s capabilities and also it’s necessities for launches. In attendance were, Chas Miller, Space Port Engineer, and Susan Raitt, Business Development. They observed at both Stage 2 in town and ABC-1 on the range.

Andy Berger, from ESRA, Experimental Sounding Rocket Association, was also in attendance. He is from the Houston area. He helps plan and host rocket competitions designed to further promote rocketry and aerospace challenges.

The team and schools finally left the range and arrived back in Alamogordo for dinner, food shopping for tomorrow, and much needed showers and rest at around 8:00 pm.

Best of luck to all schools so that they may have a successful launches tomorrow.

Event details will continue to be available here. I will provide more information each morning as to how the schedule and other event details will progress for that day and how launches went for the schools testing that day. Pictures are not allowed on the range, but some pictures of teams getting ready to leave for the range with their vehicles might be available. If anything is available I will post it for your viewing pleasure.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org. Take the time to get your school involved, the future of your students will be greatly benefited.

Rockets 2021: Travel to White Sands Today, Stage 2 and Range Set Up Information For Tomorrow, Friday

The SystemsGo team left Fredericksburg at in two shifts this morning headed to White Sands Missile Range (WSMR) in New Mexico. The last group arrived in Alamogordo at about 5:30 pm. after a late start due to a bad tire on the van. Luckily Patrick Krauskopf at 7 Day Tire was able to replace it get us on the way by 9:00 am.

The early crew, Scott Netherland and Rebekah Hyatt, met with, Brigadier General Eric D. Little, at Range Control for finalization of schedules, other information for the launches this weekend, and continued support for the program. The meeting went very favorably but they will not be able to accommodate any launches on Friday, just set up at the range. Saturday and Sunday will continue to our testing days as originally scheduled.

The group walked to Chili’s for dinner and discussion about tomorrow’s events and schedules. The team plans to leave for the Alamogordo High School tomorrow morning at 6:30 am.

Schools and other personnel also traveled in today. Tomorrow all Stage 2 checks will begin by 7:00 am. All schools and personnel are asked to be there on time and ready to work.  Schools are asked to bring their own weights to simulate load cells and nitrous oxide loads. All other needed equipment for pressure checks will be there. Load cells will be available for sale for those that need one.

Electricity and restrooms are available at the high school during the day. Each school is responsible for acquiring food and drinks for their group for all meals and snacks each day.

All documentation was completed and turned in to Rebekah Hyatt, Thursday evening upon arrival.

  • UXO briefing registry
  • WSMR waiver
  • SystemsGo waiver

Friday upon notification from WSMR, SystemsGo Staff, pertinent personnel, and students from the first two rocket teams, who have cleared Stage 2, will be going down range to set up the rails and equipment for launch. They will also load these two rockets onto the rails that evening, ready for testing, Saturday morning,

In the event that all schools are through Stage 2 and rockets are finished, then all groups will go at that time and transport rockets to the site. Therefore the earlier vehicles are completed the more chance this can be accomplished.  If this is not accomplished then the rest will come in a later group. 

The current launch order as per the draw, but contingent on readiness, are as follows:

  • Brazoswood
  • Union Grove
  • Booker T Washington
  • Alamo Heights

The current schedule has launches beginning by 8:00 am Saturday morning.

Here is the address for the high school for Stage 2 on Friday morning. It is located just east of the Walmart.

Tomorrow will be an early morning, and a busy day in preparation for Saturday’s launches.

Good luck to all schools on your rocket tests.

Event details will continue to be available here. I will provide more information each day as to how the schedule and other event details will progress for that day and how launches went for the schools testing the previous day. Pictures are not allowed on the range, but some pictures of teams getting ready to leave for the range with their vehicles might be available. If anything is available, I will post it for your viewing pleasure.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org . Take the time to get your school involved. The future of your students will be greatly benefited.

#Rockets2021 #SystemsGo #RideTheSky #Texasrockettrail #WSMRRocketLaunch2021

Sunday,Rockets 2019-Final Day at WSMR

Rockets 2019 at WSMR ended today much better than it began with two out of three rockets leaving the rail and achieving altitude. Fredericksburg High School, Anahuac High School, and Brazoswood High School all tested today. Brazoswood and Anahuac were each on their third attempt for the weekend.

Brazoswood was the top launch for the day and the final one ending the day on a high note. The 25’6″, 10″ diameter vehicle weighing in at 781 lbs fully fueled finally achieved lift off at 1:26 this afternoon after two prior unsuccessful attempts.

The rocket, named John Redden 1, after a senior member of the team that passed away of an aneurysm shortly before graduation, looked like fireworks at ignition as it blew Estes motors across the pad. Then it sailed skyward making a peak altitude of 12,859′ before nosing onto its side and sailing 5.1 miles down range to impact. The chute popped at impact.

73DA1B1A-B9A2-4DB1-A4BC-CD1B1E970E61

The first rocket to leave the rail today was “Panther 6”. Also on it’s third run for the weekend, the rocket built by Anahuac High School students, weighed in at 350 lbs, standing 23′ tall with an 8.6″ diameter. This vehicle had a “Rasberry Pi” GPS payload that a team of brothers designed and assembled. The older brother, 2018 graduate, Caleb Moore designed and 3D printed the plate to hold the payload, and the the younger, Joshua Moore, a 5th grader, assembled the GPS and did the soldering to connect it.

Panther 6 had a valve issue on the pad again today, but finally achieved lift off at 10:59 this morning. It made 1391′ traveling .3 miles down range before impact.

Both Anahuac and Brazoswood were very excited with their accomplishments. Brazoswood had hoped to break some of the standing records for height by other SystemsGo schools.  If that had happened, then student, Michael Bomar, who has a very full head of hair, and beard, had planned to allow his team mates to shave all hair from his head. Looks like he will be staying wild and woolly a while longer.

Fredericksburg’s Redbird #20 was the first test of the day, but did not leave the rail in flight. Shortly after ignition, as the vehicle began to ascend the rail, it exploded apart between the engine compartment and the main body of the rocket. The aft end stayed sitting on the load cell. The explosion blew the body to the right leaving it hanging from the rail by the top lug.  It was cocked off to the side at an angle just slightly above the end of the engine section.

This presented a challenge to the SystemsGo team and students to remove it from the rail. The students are still evaluating what casused the rocket’s accident.  When Mr. Matthes was asked what happened, he answered that it was no short answer but many factors that contributed and some were still being discussed.

Seven schools traveled to WSMR this year. One school returned home unable to launch leaving 6 to test. Literally half achieved flight and half did not.  Regardless, congratulations is in order for all students that came and attempted to launch. You made it to the rail, something that most schools in the program have yet to achieve. Whether your vehicle left the rail or not you and your teams are ahead of your peers. You came here high school grads with a rocket, you leave here, seasoned rocket scientists!

The mission was then called complete at 1:40. Cleaning and packing up of WC50 began,  as this was the official last day of testing for SystemsGo, students, and WSMR personnel.

Safe travels to all schools heading home, tomorrow. It is back to Texas for the SystemsGo team tomorrow as well. Tonight, the team enjoyed dinner, drinks, conversation and an early bed time.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be greatly benefited. minute

Friday’s Launch, an Ode to Rough Beginnings for Launch Day 1 at WSMR, Rockets 2019

Today was the perfect example of rough beginnings and a reminder that these are experimental vehicles, no matter how well the research, planning, development and projections are done.

Launches were to commence at 10:00 this morning. Union Grove High School was first up on the rail, but a leak was detected and they were bumped in order to fix the issue and keep the launches running as close to schedule as possible.

Next on the rail was Alamo Heights High School. There were several holds and the launch was delayed until after 11:22. The rocket was having an issue getting completely fueled which was slowing the launch.

Also Someone moved the cones at one of the barricades where the roads were shut down for the launch and proceeded to drive through. WSMR officials had to go secure the barricades and clear that section of the projected area again. This also delayed the launch.

During the delays, WSMR officials welcomed the parents and did a mini briefing for them in the Range Control auditorium, in lieu of the usual T-1 Briefing. During this time Alamo Heights students also gave their Student Rocket Presentations encompassing the details about and expectations of their vehicles.

Around 11:30 the decision was made that the rocket was as full as it was going to be able to achieve and therefore it was time to launch.

Before the launch I spoke with several of Alamo Heights students. According to them the vehicles name is Rocket with the R backwards like a Russian R. It is 20′ long with a diameter of 10″, weighing in at just over 600 lbs fully fueled. The payload was a Yeti cup with a Petri dish of penicillin and mold from a wallet. They intended to study the effects of radiation on both to see how it effected growth of the mold and if the penicillin became more potent.

Their recovery system was a mortar barrel system with 3 charges with a reefing system. The first charge released the nose cone, the second knocks the piston out of the barrel, deploying the third that releases the reefing lines. The vehicle also had a 3D printed nozzle which threaded into the  fuel grain which was poured directly into the tube with threading at each end to hold it in.

The vehicles projected height was 56,000′. Unfortunately it did not achieve that today. Instead it ignited and traveled up about 20′ above the rail, turned on its side and crashed to the ground just behind the two launch trailers, where it continued to burn until the engine and fuel grain completely burned out.

This made the area unapproachable for quite some time, until all flames could be put out and the rocket cooled enough to be safe to move and asses damages in the area. Unfortunately, this caused the cancellation of all other launches for the day.

SystemsGo and WSMR personnel stayed at the site to clean up, and assess and repair equipment in order to continue launches tomorrow.

There will be many things for students to evaluate and learn as to why this incident occurred, and how to prevent it in the future. SystemsGo may have some suggestions and evaluations of their own.

Currently the rocket has been recovered and SystemsGo is at the range replacing hydraulic lines on the launch trailer that were melted and working to get the switching running again.

Tomorrow will be another 10:00 am launch start. This will mean that personnel going to WC50 will be leaving for the range at 6:00 am.

Those going to watch the launches from Range Control will be heading out at 8:00 a.m. to meet our rep in the gravel lot outside the main gate by 9:00 a.m.

Tomorrow’s launch schedule is as follows:

  • 10:00 a.m. Union Grove High School
  • 12:00 a.m. Anahuac High School
  • 14:00 p.m. Marble Falls High School
  • 16:00 p.m. Brazoswood High School

If it is a perfect day and all goes well with no exceptions with each launch, then only Fredericksburg High School’s and Booker T Washington High School’s two rockets would be left for Sunday.

Realistically, this is a very tight launch sequence with little to no room for errors. As we saw today, errors can and do occasionally happen and can cause severe delays in the launch schedule and hinder time availability.

If we do not get all four launches tomorrow, then they will carry over into Sunday time slots as allowed by WSMR.

Sunday is a contingency day if needed in which four more vehicles could launch, otherwise we will travel home that day.

Best of luck to all schools so that they may have a successful launches tomorrow.

Event details will continue to be available here. I will provide more information each morning as to how the schedule and other event details will progress for that day and how launches went for the schools testing that day. Pictures are not allowed on the range, but some pictures of teams getting ready to leave for the range with their vehicles might be available. If anything is available I will post it for your viewing pleasure.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org. Take the time to get your school involved, the future of your students will be greatly benefited.

Thursday Rockets 2019 Headed to White Sands-Day 1 Set up-Report and Friday Early Information

The SystemsGo team left Fredericksburg at 5:30 this morning headed to White Sands Missile Range (WSMR) in New Mexico. They arrived in Alamogordo at about 1:30 and headed straight to West Center 50 to set up the range. It was a successful day for the team as they were able to set up the rail and test equipment, leaving only minor things to be finished Friday morning.

They left the range around 6:40 and headed in to supper at Si Senor Mexican Restaurant. Afterwards the team split sending some to gather supplies for tomorrow while others went to meet schools still needing to complete their FRR checks.

The current schedule has launches beginning by 10:00 tomorrow morning.

Here is a quick recap from Rebekah Hyatt’s Friday emails:

Friday: All essential personnel from all schools meet in the Quality Inn parking lot at 6:15 and caravan to the  Tula Gate arriving by 7 AM. Look for the white van with SystemsGo on the side. There will be a safety briefing on site at WC50 at 7:30 so please be prompt.
Once your rocket is on range and ready to go to the rail and you are NOT one of the first 4 to launch,  you will be allowed to leave the range when we evacuate for the first launch. If you are one of the first 4 to launch, you will be evacuated and brought back after  launch.
We have 3 launch times for Friday beginning at 10 AM with 2 hour intervals. All spectators must be at the main gate no later than 8:30 AM. Ginger Burow and Anna Cardon will be waiting in the dirt area to the right just ahead of the gates. We will need a vehicle count from each school which should be provided to Ginger prior to arriving at the gate. They only allow the total count we supply through the gate.
After being led through we will follow to the base theater for a 9:15 briefing by military officials. It should be short and then the group will proceed to Range Control ahead of a 10:00 first T time. This is a tight schedule so please do not be late to the gate. Please have your ID with you and be advised that no electronics of any kind including fitbits are allowed inside Range Control.
Below is the current schedule of launches:
Note that is as long as all rockets are completely ready.
  • Friday:
    1. Union Grove High School
    2. Alamo Heights High School
    3. Booker T Washington High School (Rocket 1)
    4. Anahuac High School (if the time allows for a fourth launch)
      1. Brazoswood High School (1st to move up in the event Anahuac is not ready)
  • Saturday: If only 3 are tested on Friday
    1. Anahuac High School
    2. Marble Falls High School (will launch Saturday no matter how the schedule moves.)
    3. Brazoswood High School
    4. Fredericksburg High School
    5. Booker T Washington (Rocket 2)

Event details will continue to be available here. I will provide more information each day as to how the schedule and other event details will progress for that day and how launches went for the schools testing the previous day. Pictures are not allowed on the range, but some pictures of teams getting ready to leave for the range with their vehicles might be available. If anything is available, I will post it for your viewing pleasure.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org . Take the time to get your school involved. The future of your students will be greatly benefited.

 

Saturday,Rockets 2018-Final Day at WSMR

SystemsGo scheduled three tests today at White Sands Missile Range, Booker T. Washington, Alamo Heights, and Anahuac. After these three launches, Union Grove would have the opportunity to have a second attempt at launch after fixing the malfunction from Friday’s launch.

Booker T. Washington’s rocket was the first test. Students had loaded the rocket onto the rail before leaving West Center 50 Range at mission completion last evening. The schedule had the school’s T time set for 8:00 a.m. It’s actual T time ended up being at 9:12 after two holds caused by issues with wiring on the rocket which caused the vehicle to have to be vented,  brought down, fixed and reloaded. Unfortunately, the rocket never left the rail. At ignition, the rocket only smoked,  ending in a misfire. Due to the misfire, a 30 minute wait time had to be observed for safety until it could be removed. Following the 30 minute wait, the vehicle was the vented and removed from the rail. It is believed that the injection system did not open.

Alamo Heights  was next on the rail. The schedule was now two hours behind. They loaded without incident and observed a T time of 11:57. It achieved ignition and lifted off the rail. It was a great launch, but turned on its side, continuing on up with an angle headed down range. The rocket reached a peak altitude of 23,083 feet, but due to the launch rail being at a MSL (mean sea level) of 4,521 feet, the final height reached was 18,562 feet. This number is calculated by subtracting the MSL from the peak altitude.

Vehicle velocity was 1503 feet per second. It traveled 26326.323 feet down range which equals 4.986 miles. WSMR reported that the chute did deploy before landing. Alamo Heights’ rocket had the second highest altitude, and also achieved the greatest distance traveled traveled for the weekend. After WSMR recovered the rocket it was determined that only the Drogue chute opened and then melted as the vehicle was still burning. Because of this the rocket had a ballistic re-entry, burying itself in the range. Only the engine casing with fins intact was returned to the team as seen in the picture above. In the picture below, the team is shown with the rocket before launch.

FD40E23B-2318-4A1E-87E2-7A43651DDEDF

Anahuac was next on the rail at 2:09 p.m. They had no lift at ignition, only a partial burn. It also vented the Nitrous through a hole in the injector bay. According to analysis from Anahuac, a hose between the injector and diffuser plate blew a fitting where it attached to the diffuser plate. They are not sure what caused this at this time, but they were able to confirm that the tank and injector were intact. The partial burn created another hang/misfire situation creating another safety delay of 30 minutes before the vehicle could be off loaded from the rail.

By the time this delay was up it was 2:45 and range end time for air space was 3:30. This effectively ended our mission time on the range, called officially by WSMR officials. Due to this, Union Grove was unable to go for a second attempt.

The mission was then called complete. Cleaning and packing up of WC50 began,  as this was the official last day of testing for SystemsGo, students, and WSMR personnel.

Safe travels to all schools heading home, tomorrow. It is back to Texas for the SystemsGo team tomorrow as well. Tonight, the team enjoyed dinner, drinks, conversation and an early bed time.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be greatly benefited. minute

Thursday, Welcome to White Sands Missile Range-T-1 Briefing and WC-50 Set up Day and Friday Schedules

Today was a productive first day at White Sands Missile Range (WSMR) for the SystemsGo and the participating schools.

This year the group was invited to begin their engagement at WSMR with the viewing of a live Missile Test. The group watched the test which consisted of three missiles from the Missile Park on White Sands Missile Range at 8:00 a.m.

This viewing meant an early morning for the group rising at 4:00 a.m. in order to have the convoy at the Las Cruces Gate by 6:45 a.m. so that all vehicles could be checked through the gate in time to watch the test. Early mornings are a pretty normal occurance for the time here at WSMR.   Tomorrow will be no exception.

After the Missile Test viewing, the group was lead to the Post Theater. They were officially welcomed to WSMR and participated in the T-1 Briefing, Safety and Security procedures briefing, Public Affairs briefing, as well as other important informational briefings. During this time each school also gave their Student Rocket Presentations encompassing the details about and expectations of their vehicles.It was an educational and informative session.

WSMR personnel made introductions so all involved would know who they are and who to contact for help from the base. Scott Netherland introduced the SystemsGo team and specified their roles with the organization. We finished around 10:30 and headed out to West Center 50 launch site(WC50).

After arrival at WC-50 at around 11:30 a.m., the group worked hard to complete full project equipment set up, after which, they performed a communications check,  field readiness and systems checks, all rockets went through final pressure checks, and simulated launch countdown was enacted.

Fredericksburg’s Rocket was loaded onto the rail and left for first launch tomorrow morning.

The group left the range for the day at 7:00 p.m.

Tomorrow will be another  early morning for all of us. Teams launching and SystemsGo personnel will be headed out to WC50 at 5:00 a.m. to meet WSMR personnel at the Tula gate by 6:00 a.m.

Those going to watch the launches from Mission Control will be heading out at 6:00 a.m. to meet our rep in the gravel lot outside the main gate near Las Cruces, by 7:00 a.m.

Tomorrow’s launch schedule is as follows:

8:00 a.m. Fredericksburg High School
10:00 a.m. Brazoswood High School
12:00 a.m. Booker T. Washington High School                                                                    14:00 a.m. Anahuac High School

If it is a perfect day and all goes well with no exceptions with each launch, then the tests should be complete by 15:00 p.m.

Realistically, this is a very tight launch sequence with little to no room for errors. If we do not get all four launches tomorrow, then they will carry over into Saturday time slots creating up to four  launches on Saturday. Last year SystemsGo was able to hold this schedule. Hopefully tomorrow will go as well.

Sunday is a contingency day if needed in which four more vehicles could launch, otherwise we will travel home that day.

Best of luck to all schools so that they may have a successful launch tomorrow and that all schedules hold true.

Here is the current preview of the launches scheduled for Saturday. Tomorrow’s blog will have a final schedule for the day based on Friday’s test success.

Saturday’s launch order: Union Grove, Alamo Heights, any retests.

Event details will continue to be available here. I will provide more information each morning as to how the schedule and other event details will progress for that day and how launches went for the schools testing that day. Pictures are not allowed on the range, but some pictures of teams getting ready to leave for the range with their vehicles might be available. If anything is available I will post it for your viewing pleasure.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org. Take the time to get your school involved, the future of your students will be greatly benefited.

Wednesday Rockets Headed to White Sands-Day 1-Report and Tuesday Early Information

The SystemsGo team left Fredericksburg at 10:43 a.m. this morning headed to White Sands Missile Range (WSMR) in New Mexico. They traveled with the Fredericksburg High School rocket group. After supper in El Paso, they arrived in Alamogordo, NM, for lodging at 7:33 p.m. this evening. All participating schools also arrived safely.

Tomorrow is an informational and set up day. SystemsGo personnel and all students, teachers, and parents from the schools will have an early morning. We will be leaving the hotel at 5:45 a.m. to meet up at the gravel lot out side the Main Gate (Las Cruces) at 6:45 a.m.

The convoy will be led to Missile Park to view a live Missile Test at 8:00 a.m. Next, they will proceed to the Post Theater for the T-1 briefing and a short presentation by each school on their vehicle and it’s expectations. Afterwards SystemsGo, students and necessary personnel go to West Center 50 launch site to set up and prep vehicles.

Parents will be dismissed at that time to find their own entertainment for the day. Only SystemsGo personnel, teachers, student teams and essential personnel will go to WC50.

Friday is the first launch day and at this point, it is slated to be an early morning. Fredericksburg High School is first up to launch for the day and the current schedule has them testing at 8:00 a.m. The hope is to test 4 vehicles by 2:00 p.m, including Brazoswood, Booker T. Washington, and Anahuac.

Event details will continue to be available here. I will provide more information each day as to how the schedule and other event details will progress for that day and how launches went for the schools testing the previous day. Pictures are not allowed on the range, but some pictures of teams getting ready to leave for the range with their vehicles might be available. If anything is available, I will post it for your viewing pleasure.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org . Take the time to get your school involved. The future of your students will be greatly benefited.

 

Fredericksburg’s Engineering Rocket Program-(April 13-June 1) Final Classroom Update for Freshmen, Sophomores, Juniors and Seniors

Today is May 31, 2018 and we are catching up on the FHS Engineering program and what they have done since April 13th. This article will also bring the a fabulous year to an end for the Freshmen, Sophomores, and Juniors, since the school year is ending this Friday, June 1st, with graduation. They will all resume studies in the program next school year. After graduation, we will resume Redbird #19 updates with the graduates through June until they have launched at White Sands Missile Range (WSMR).

It has been seven weeks since our last update on the Freshmen, Sophomores, and Seniors and quite a bit has been happening on all levels.

On Tuesday, May 15, the Freshmen embarked on a field trip to three locations. They began here in Fredericksburg, at Fischer and Wieser. Next they went on to the University of Texas at Austin to the JJ Pickle Research Center-Ferguson Structural Engineering Lab, and then a main campus tour including the Engineering Education and Research Building.

Ashley Seelig, Dietz Fischer and Nicole Whorton began the day at Fischer and Wieser giving the students a historical background on the company. Afterwards they took them on a walk through of the plant during which they described all aspects of their process, beginning with material acquisition through the shipment of products. Students found this familiar as it closely related to their orange juice production project completed earlier this year.

It was noted that the staff at Fischer and Wieser all work well with each other. They provide a comfortable working environment with a sense of family and pride in what they do.  They were all happy to host the students and show them around.

At the JJ Pickle Research Center-Ferguson Structural Engineering Lab at UT,  Dr. Tricia Clayton hosted the students. She began by discussing structural engineering and the scope of the work they do at the lab. The facility is nearly 50,000 square feet, and one of the largest labs in the country for testing and research of structures. This includes material types, fabrication process integrity, testing on pieces taken out of operation (like cracked bridge structures), train track safety and much more.

Next Dr. Clayton enlightened students on how she progressed from a high school student, to a PhD recipient, as well as a researcher and college professor.  Mr. Matthes commented that, “Her enthusiasm was contagious as her passion for her field of study and teaching bubbled to the surface.”

FHS Alumnus Matthew Dulaney,  and Sterling Weatherford took the group to lunch at the Market Place located below Dobie Dormitory. Matthew is studying Chemical Engineering at UT and Sterling who was visiting, is studying Aerospace Engineering at Arizona State University. The two shared their own individual perspectives of their college experiences as they gave the students a walking tour of the main campus.

The students’ last stop was at the Engineering Education and Research Center Building. Here they found the building’s structural supports interesting, as well as a 3 story, 10 foot radius spiral staircase with only a center support structure. The main attraction was on the bottom floor. There they admired the very extensive 3D printing lab. The air conditioning was also a major hit with the students after their campus tour in the heat.

As far as class work, they have done quite a lot since the mid-April program report. They have completed their Orange Juice Production Plant project as well as a project to calculate aerodynamic drag on a rocket. They are currently trying to research and calculate the characteristics of a hybrid rocket motor. This is the aerospace component of the project.  This has helped the students reach new heights and has left them a bit overwhelmed according to Mr. Matthes.  They presented their findings in the classroom on Tuesday.

The sophomores were allowed to work through the curriculum at their own pace this year, due to that the group is spread out in their studies. While there are those that have completed the curriculum others are still working hard to get all the materials done.  Those that have completed ahead, have moved forward into 3D modelling and printing of their material findings.

Next year, a new class called Intermediate Computer Aided Drafting and Design (ICADD) will be added, allowing new students the opportunity to delve deeper into 3D modeling with AutoDesk’s program, Inventor.  This is a good thing, according to Mr. Matthes because, “The class should provide students all the fundamentals of 3D modelling and having those skills down will have them ready to take on other equivalent programs such as SolidWorks (A Common 3D Modelling Software For Mechanical Type of  Drawings).  This will have them ready for any higher education drafting classes as colleges and technical schools tend to stick with those two software suites for modelling mechanical drafting.”

There have been two updates on the Juniors as they launched their rockets at the Fredericksburg Rockets 2018 in Willow City on late April 26th. If you missed those launches, you can still view them on the Livestream videos from the weekend. They can be found at the following link:

https://livestream.com/systemsgo

Here are some pictures from Mr. Matthes of the Junior teams on their launch day. I have also included a synopsis of their rocket’s accomplishments that day.

Team 1’s rocket, labeled as rocket #34 had a beautiful lift off from the rail, but before reaching its full height went into a cork screw spin, nosed over and began a ballistic decent. It landed hard on its side in a field to the left of the Pad and charges didn’t deploy until hitting the ground. It was fully recovered which enabled them to get  data from the rocket. Their vehicle reached 588 mph, 0.78 Mach.

 

Team 2 had an awesome flight with full deployment  and recovery. The rocket flew to a height of 11,232 feet at a speed of 763.6 miles per hour. The vehicle broke the first sound barrier at 1.027 Mach. Unfortunately their camera did not turn on  properly so no flight video, and their payload which was a bag of Cheezits which was supposed to burst open due to pressure drop,  was still intact, the bag did not open. Congratulations on breaking the sound barrier.

 

And here are some additional students that helped at the pad during the Fredericksburg launches.

  

Currently the Juniors have been completing things in order to present their Post Mission Analysis this week.  Team 1, was on Tuesday at 1:40 p.m. and Team 2 on Thursday at 12:30 p.m. at FISD’s Central Office board room. All are welcome to attend. Come learn about the program. Asking questions of the presenting students is encouraged.

This will conclude this year’s reports on the Juniors. We will pick up with them next year as seniors when they begin their Goddard level project and attempt to launch at White Sands Missile Range.

The Seniors have approximately 23 days until Redbird 19 is scheduled for testing at White Sands Missile Range, on June 22.  This date is fairly permanent  but still at the mercy of the Army until closer to that time. Mr. Matthes will announce if there are any changes to that date.

Progress on the Redbird #19 rocket is ongoing. Students are in a waiting and coordinating process with SRM, a local machine shop with which  that they have the larger metal work contracted out. A helping advantage they have this year, is that FHS Alumni, Joseph Sanchez, hired on for the summer with Luke Morin at SRM. Joseph has been instrumental as a liaison between the team and the machine shop. Mr. Matthes states, that “this will surely help organizationally with the completion of the project.” He also says, “Kudos” to Joseph for his ability to acquire a summer job at SRM.

The Redbird #19 team is currently slated to depart for White Sands on June 20th with the test-minus-one(T-1) briefing  on the morning of the 21st, and final rocket preparations occurring that afternoon. Students are expected to give an overview of their rocket, payload and flight expectations for WSMR officials at the T-1 briefing.

Fredericksburg will be first to fly on the 22nd, therefore their rocket will be loaded onto the rail and left over night the 21st. This allows things to move faster the next morning as loading the payload, attaching the nose cone, loading oxidizer, and testing the rocket are all that will need to be done.

According to Mr. Matthes,  “As always, there is a chance the rocket won’t fly due to some technical failure occurring in the process of filling or ignition.  This sort of failure occurs regularly at White Sands as a testing grounds.  The difference between what the students do and industry does is cycling the process:  conducting a post mission analysis, correcting sources of problems and then having another go.  The lack of the opportunity to try again makes the individual testing of as many components as possible all the more important.  As of yet, the only testing performed has been on the altimeter which has proved positive for expected operation.  Time will tell what else the students have time to test.”

The team is running late on their completion  schedule due to their own delays and some things beyond their control and this will likely mean no preliminary testing of components, but they are expected to complete the rocket in time for launch.

Mr. Matthes had this to say about the senior class, “The class of 10 students together has accumulated over a 1000 hours of overtime (out of class engineering time) and has a few hundred to go before the project is done.  They have worked hard and will see the fruits of their labor continue over the summer. The students graduate Friday night and after 3 years, and 4 years for many of them, it is always bittersweet to send my students off.  The projects always delay the farewells until post launch but it is a significant leap for these young men and Miss Secrhist.  I am proud of all of them and look forward to all the great things ahead in their lives.  It is a diverse group of students with extensive interests and pathways.  I’m sure their paths will twist and turn as they move on but their trajectory looks promising and exciting.”

Congratulations to Harrison Spisak on s job well done! He was awarded the Engineering Academic Excellence Award, on May 7, at the FHS Academic Excellence Awards Banquet.

This article is the seventh for the 2017/2018 school year in a series of periodic updates that has followed the Fredericksburg Engineering/Rocket program. This school is a participant of the SystemsGo STEM program. This series of articles is intended to support and encourage students in the program as they share their working status and accomplishments throughout the year in the program. These publications will be available for tags and re-posting.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org . Take the time to get your school involved, the future of your students will be greatly benefited.