White Sands Missile Range SystemsGo Rocket Program 2024

White Sands Missile Range is once again hosting the SystemsGo Rocket Program again for its season end launches. This year three schools will be traveling to New Mexico to test their rockets at White Sands Missile Range, they include: Alamo Heights HS, Brazoswood HS, and Union Grove HS.

June 14th through June 16th are the dates for this year’s WSMR launch.  The SystemsGo team and schools will be traveling to Alamogordo, New Mexico for lodging on June 13th. Early on the 14th, preparations at the site will be made with the goal of launching all three rockets Saturday.  The 16th, Sunday, is our contingency day, but the hope is that it will not be needed. Sunday is Father’s Day and WSMR personnel would prefer not to work and we would love to be on the road home.

We continue to launch from range ABC1. This range required the altitude cap for the rockets to be adjusted from the original height cap which was 100,000 feet. The current cap instituted three years ago is 50,000 feet. ABC-1 does not have a large bunker, so only essential launch personnel stay on site, and the SG staff evacuate out five miles for launches. Students and teachers are taken to a secure location known as Tula G, which is further down range where they watch the launches on screen inside a designated facility.

There will be tents on the range, the same as last year. Rockets need to be complete by the end of the day on Friday.

The T-1schedule on Saturday will be very tight. Range time begins at 7:00 am and ends at 4:00 pm. The range is Hot all day for us, which translates to as soon as we can reset and be ready to launch again, WSMR is ready to assist. This should make keeping the schedule and sending all three rockets skyward a viable task for Saturday.

If Mission is Complete on Saturday evening, then evening activities may include some White Sands National Park dune sledding.

SystemsGo team members will be residing at the Quality Inn and Suites in Alamogordo this year.

There are three schools scheduled to launch their rockets. These include:

  • Alamo Heights
  • Brazoswood
  • Union Grove

The current launch schedule is as follows:

  • Thursday, June 13th
    1. Travel Day
    2. Pressure Checks and FRRs that evening at the hotels.
    3. Security checks of all Form 5000s
  • Friday, June 14th
    1. Site Set up ABC-1 7:00
    2. Depart for site from hotel–TBA
    3. Complete all rockets.
    4. 3:00 p.m. Leave the site with Alamo Heights and Brazoswood on the rails.
  • Saturday, June 15th
    1. Launch Day (Three Rockets, barring any schedule changes by WSMR.)
    2. Depart from hotel for arrival on site–TBA
    3. Projected launch schedule:
      • T1 8:00 a.m.
      • T2 9:00 a.m.
      • T3 11:00 a.m.
  • Airspace Ends – 4:00 p.m.
  • Pack site
  • Evening Activities as time allows.
  • Sunday, June 16th
    1. Travel Day-Contingency Day only if absolutely needed. WSMR does not want to work on Father’s Day.
  • Monday, June 17th
    1. Travel Day-Hopefully we are already home.

The Goddard level rockets, which are the capstones of the SystemsGo program and the culmination of all the skills the students have learned throughout their years in the STEM program. This marks the final senior project for the schools that participate in for the SystemsGo program.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be benefited.

#Rockets2024 #SystemsGo #Launcher01 #RideTheSky #Texasrockettrail #EyesOnTheSkies #TexasToNewMexicoRocketTrail #RideTheSky2024

Rockets 2023 Arrived in Alamogordo, Thursday for WSMR Launches on Saturday

The SystemsGo team left Fredericksburg at in two shifts, one at 6:00 a.m. and the second at 8:30 a.m. this morning headed to Alamogordo, for lodging for White Sands Missile Range (WSMR) rocket launches in New Mexico. Schools from Union Grove, Alamo Heights and Brazoswood also traveled to Alamogordo today to meet and begin preparations for launches this Saturday

The early crew, Rebekah Hyatt and George Burns, set up by 3:00 p.m.in the parking lot of the Quality Inn and Suites to preform pressure and FRR checks for Union Grove and Alamo Heights teams. At 8:45 p.m. the SystemsGo team walked to Applebee’s for dinner as the students from Alamo Heights were still evaluating their rocket and finishing configuration.

Portable restrooms are available at the site. Limited electricity is available. Each school is responsible for acquiring food and drinks for their group for all meals and snacks each day, except lunch on launch day will be provided by WSMR.

All documentation was completed and turned in to Rebekah Hyatt, Thursday evening upon arrival.

  • UXO, Wildlife, and Driving in WSMR briefing registry
  • WSMR waiver
  • SystemsGo waiver
  • Medical Release Forms

Be prepared to show ID’s at the security check at the gate in the morning.

There are three schools scheduled to launch four rockets. These include:

  • Union Grove
  • Alamo Heights
  • Brazoswood

The current launch schedule is as follows:

  • Friday, June 23rd
    1. Depart for site from hotel by 7:15 a.m.
    2. Meet at Tula Gate for Security Checks at 8:00 a.m.
    3. Alamo Heights and Union Grove will be in our caravan from the hotel. Brazoswood will meet us at the Tula Gate.
    4. Travel to ABC-1 at 9:00 a.m.
    5. Site Set up at ABC-1 upon arrival.
    6. Complete all rockets.
    7. Leave the site with Union Grove and Alamo Heights on the rails and Brazoswood completed and ready to load the rail by 5:00 p.m.
  • Saturday, June 24th
  • Launch Day (Three Rockets, barring any schedule changes by WSMR.)
  • Depart from Hotel by 5:15 a.m. for 6:00 a.m. arrival at Tula Gate for Security checks.
  • Depart Gate to ABC-1 6:30 a.m.
  • Projected launch schedule:
    • T1 8:00 a.m. –
    • T2
    • T3
    • All rockets launched by 2:00 p.m.
    • Break for Lunch 2:00 p.m. – 3:00 p.m.
    • Range Time Ends – 4:00 p.m.
  • Sunday, June 25th
  • Contingency Day/Cleanup/Fun Day/ Travel (To be determined.)
  • Monday, June 26th
  • Travel Day

The schedule as seen above is a preliminary estimate, and though accurate as stated by Program Director, Rebekah Hyatt, at the moment, is subject to changes and adjustments as needed per WSMR necessities.

The Goddard level rockets, which are the capstones of the SystemsGo program and the culmination of all the skills the students have learned throughout their years in the STEM program. This marks the final senior project for the schools that participate in for the SystemsGo program.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be benefited.

#Rockets2023 #SystemsGo #Launcher01 #RideTheSky #Texasrockettrail #EyesOnTheSkies #TexasToNewMexicoRocketTrail

2023 Marks 25 Years White Sands Missile Range Hosts Student Rockets

2023 is a year of milestones for the Fredericksburg based STEM rocket program beginning with White Sands Missile Range hosting the SystemsGo Rocket Program again for its season end launches. This event marks the 25th year the STEM based program has brought high school seniors to the Army Base to test the program’s highest-level rockets, known as Goddard. It would have marked 25 consecutive years, but COVID took out 2020 putting the numbers behind by a year. The program took its first rocket from Fredericksburg High School to WSMR in 1999. The nonprofit organization supporting this STEM program in schools officially began in June of 2003, making this 2023 season its 20th Anniversary as well. This year three schools will be traveling to New Mexico to test their rockets at White Sands Missile Range, they include: Alamo Heights HS, Brazoswood HS and Union Grove HS.

June 23rd through June 25th are the dates for this year’s WSMR launch.  The SystemsGo team and schools will be traveling to Alamogordo, New Mexico for lodging on June 22nd. Early on the 23rd, preparations at the site will be made with the goal of launching all three rockets Saturday afternoon.  The 25th is our contingency day, but it is only a contingency for completing cleanup at the site, or if WSMR must delay our launches. It will not be a day to recycle rockets that fail.

We continue to launch from range ABC1. This range required the altitude cap for the rockets to be adjusted from the 20-mile radius the program previously had available for these test vehicles to travel and stay within their parameters. The original height cap was 100,000 feet. The current cap instituted two years ago is 50,000 feet. ABC-1 does not have a large bunker, so only essential launch personnel stay on site, and the SG staff evacuate out five miles for launches. Students and teachers are taken to a secure location known as Tula G, which is further down range where they watch the launches on screen inside a designated facility. Parents are no longer allowed to come, since the theater at Mission Control is no longer the viewing area. Volunteer staffing of base personnel for this has still not resumed.

Schools are asked to arrive early on the 22nd in Alamogordo to do pressure checks with as little time spent on configuration as possible. At least two vehicles need to have this stage complete before heading down range on the 23rd.  Preferably very little time will be spent on assembly on the 23rd. Some weight, CG, and FFR verification can be done if needed downrange the 23rd.  There will be tents on the range, the same as last year. Rockets need to be complete by the end of the day on Friday.

The first T time on Saturday will be 8:00 a.m. After that the range is Hot all day for us, which translates to as soon as we can reset and be ready to launch again, WSMR is ready to assist. This should make keeping the schedule and sending all three rockets skyward a viable task for Saturday.

WSMR personnel, including Test Center Commander, Colonel Shawanta Smart, and Range Operator, Lori Leyva, will be on site during the launches. WSMR will be providing lunch for all participants. Colonel Smart began her command in August of 2021, making this her second rocket season with the program. She stopped in last year for a brief visit, but plans to be onsite to see more of how the program operates. Ms. Leyva will be retiring after this year. Her service in coordinating SystemsGo and WSMR in launch efforts has been extremely beneficial to the program over the years she has been with us. SystemsGo will be making special presentations during the lunch break.

Saturday is a contingency day, but preferably it should be no more than a site cleanup day if needed that morning. Provided that we accomplish this early the remainder of the day’s activities will be decided at that time.

SystemsGo team members will be residing at the Quality Inn and Suites in Alamogordo this year.

There are three schools scheduled to launch four rockets. These include:

  • Union Grove
  • Alamo Heights
  • Brazoswood

The current launch schedule is as follows:

  • Thursday, June 22nd
    1. Travel Day
    2. Pressure Checks and FRRs that evening at the hotels.
    3. Security checks of all Form 5000s
  • Friday, June 23rd
    1. Site Set up ABC-1 9:00- 9:30 a.m.
    2. Depart for site from hotel by 7:45 a.m.
    3. Complete all rockets.
    4. Leave the site with Union Grove and Alamo Heights on the rails.
  • Saturday, June 24th
    1. Launch Day (Three Rockets, barring any schedule changes by WSMR.)
    2. Depart from hotel by 4:45 a.m. for 6:00 a.m. arrival on site.
    3. Projected launch schedule:
      • T1 8:00 a.m. –
      • T2
      • T3
      • Break for Lunch 2:00 p.m. – 3:00 p.m.
      • Range Time Ends – unspecified currently.
  • Sunday, June 25th
    1. Contingency Day/Cleanup/Fun Day/ Travel (To be determined.)
  • Monday, June 26th
    1. Travel Day

The schedule as seen above is a preliminary estimate, and though accurate as stated by Program Director, Rebekah Hyatt, at the moment, is subject to changes and adjustments as needed once the entire group is in New Mexico.

The Goddard level rockets, which are the capstones of the SystemsGo program and the culmination of all the skills the students have learned throughout their years in the STEM program. This marks the final senior project for the schools that participate in for the SystemsGo program.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be benefited.

#Rockets2023 #SystemsGo #Launcher01 #RideTheSky #Texasrockettrail #EyesOnTheSkies #TexasToNewMexicoRocketTrail

The Texas Rocket Trail 2023 Ended in Southeast Texas/Smith Point Friday

Friday marked the end of the Texas Rocket Trail for Rockets 2023, as the second and final day of launches in Smith Point boasted good weather and a steady line of rockets coming for testing. The original schedule listed 22 rockets for testing, but by day’s end one carryover from Thursday added and 5 vehicles dropped off the docket, leaving only 18 to launch which still creates a full day.

Most rockets left the rail on their first try, with only 4 having to make extra attempts after minor adjustments. In all it was a good day of steady launches. Of the 18 launched today, all but three were recovered. Of those three, one ballistic re-entry was only marked by sound no sight, one sunk in the bay, and a third land in a gator pond. The last might yet be recoverable with the use of an air boat in the next few days. Only time will tell if the students get it back, or if the gators will get to keep their new rocket.

Mission Complete was called at 6:40 and the sight was packed up by 7:45. The team had a final meal together for the spring season at Tita’s Hurricane Seafood Restaurant in Oak Island, visiting for a while and then heading to bed or home for the evening. It was another good year of launches, with great weather and good help to make everything go smoothly.

Spring launches are complete for 2023. The summer launches at White Sands Missile Range in New Mexico are next up on the schedule in late June.

  • Schools participating on Friday were: Atascosita HS, North Shore HS, Brazoswood HS, Friendswood HS, Hargrave HS
  • A live feed for each launch in the spring series will be available for viewing at www.systemsgo.org/events  

Thank you for joining us for launch season, and for supporting the schools and youth that participate in the SystemsGo curriculum. Most of the team members that travel with SystemsGo are volunteer based. We support them to ensure the program continues. We have all seen first hand the impact this STEM education program has had on family members and community members students, and the futures it has afforded those who participated in it and went on to college and beyond, applying what they learned.

Please watch the SystemsGo website, SystemsGo Facebook page,  SystemsGo Twitter feed: https://twitter.com/SystemsGoNews and this blog for upcoming information on these events.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org . Take the time to get your school involved, the future of your students will be greatly benefited.

Hope you enjoyed this year’s launches!

#RideTheSkies #texasrockettrail #Rockets2023 #EyesontheSkies

Rockets 2023 Southeast Texas/Smith Point Launches Thursday Recap

Southeast Texas Rockets started off Thursday in Smith Point. After a rainy and stormy set up day on Wednesday, we enjoyed partly cloudy skies, and a breeze for most of the day. It was humid and steamy, and puddles riddled the site, but it was still a manageable weather situation for the launches.

The drawbacks for the day were that we started off with the Internet and the port-a-potties still MIA to start the day. The Internet arrived for set up at 10:15, a good four hours into the day. Potties were closer to 11:00 leaving the spectators and workers alike waiting uncomfortably for their arrival. Both providers cited miscommunications on the timeline for the event.

Rockets started arriving in Stage 3 around 11:00, but the first full volley of launches was not until 1:22. One rocket came down pegging the top a volunteer’s car, denting the roof. That was the only hazard for the day. Our new school from the American Community Schools of Abudhabi, launched later in the afternoon. It was a beautiful launch, but the parachute system failed to deploy, and it came down as a ballistic lawn dart about 150 yards from Mission Control and was lost in a marshy bog. It was both a thrill and a disappointment for a group of students the traveled so far to participate.

19 rockets arrived for testing today. Of those, 17 were launched and left the rail, 1 had to abort at the end of the day, unable to complete their vehicle, and one though reworked several times had to push off until tomorrow for another chance at the rail. Five were left unrecovered, with the hope they may show up tomorrow. Mission Complete was called at 7:42 for the evening.

Twenty-two more rockets are scheduled for Friday.

Pictures from the above-mentioned events, and rockets as well as progress at the site to this point are on SystemsGo Facebook page, as well as my Facebook page. They can be found here:

https://www.facebook.com/SystemsGoEducation/

https://www.facebook.com/ginger.burow

Festivities continue with launches resuming tomorrow, Friday.

Restrooms and wash stations will be provided at the launch site. Spectators are welcomed this year. Teachers are asked to bring pop-up tents for themselves and their students. Please remember sunscreen, chairs, umbrellas, extra snacks, drinks, and food. Downtime entertainment for the students to engage in between launches may also be helpful.

The look on your students’ faces when their vehicle goes up and then is recovered is priceless. If they know you are watching and supporting them, then it is even more memorable. If you are not on site, then shoot them a text, letting them know you are watching online.

The Southeast Texas/Smith Point launch date continues Friday. Livestream links and schools are also listed here for your convenience or can be found at http://www.systemsgo.org/events/ .

Southeast Texas Launches

  • Friday, May 12, 2023
  • 12 are Schools participating this year in Smith Point
  • 22 expected rockets for testing on Friday.
  • A Livestream for each launch will be provided and will be available at www.systemsgo.org/events as each launch date arrives. Friday’s is as follows:

The sites will be open to admittance for students and teachers only at 6:00 a.m. Projected start time for launches is between 8:00 a.m. and 9:00 a.m. All is contingent on test vehicle readiness and ability to pass Stages 1 and 2. Mission Control will be ready for Stage 3 checks by 8:00 a.m.

More details will be available here each day. Reports featuring schedule links, school names, results, pictures, and editorial content will be posted during the events if information is available.

Please watch the SystemsGo website, SystemsGo Facebook page,  SystemsGo Twitter feed: https://twitter.com/SystemsGoNews and this blog for upcoming information on these events.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org . Take the time to get your school involved, the future of your students will be benefited.

Hope to see you at the launches!

#RideTheSkies2023 #TexasRocketTrail #Rockets2023 #EyesToTheSkies

Rockets 2023 Southeast Texas/Smith Point Launches This Thursday

The 2023 Texas Rocket Trail season is on it’s last leg of the junior series launches with the Southeast Texas/Smith Point testing site. Currently 38 vehicles are scheduled for testing by 12 schools at this site. Testing begins this week, May 11-12, with a weather contingency day to be used only if needed on May 13.

The Southeast Texas/Smith Point launch dates, locations, and schools are also listed here for your convenience or can be found at http://www.systemsgo.org/events/ .

Southeast Texas/Smith Point

  • Thursday, May 11 – Saturday, May 8
  • Launch & All Stages: 19350 FM 562, Anahuac, TX 77514
    South of Anahuac, near Smith Point, Texas
  • Schools participating: Gary HS, Hardin-Jefferson HS, Hargrave HS, North Shore HS,  Anahuac HS, Booker T Washington HS, Brazoswood HS, Kingwood Park HS, Milby HS,  Summer Creek HS, Odyssey HS, Friendswood HS
  • 38 expected rockets for testing
  • A Livestream for each launch is provided and available at www.systemsgo.org/events

The sites will be open to admittance for students and teachers only at 6:00 a.m. All is contingent on test vehicle readiness and ability to pass Stages 1 and 2. Mission Control will be ready for Stage 3 checks by 8:00 a.m. First launch as soon as we have some cleared to the pad.

Restrooms and wash stations will be provided at the launch site. Concessions will be provided on site. Teachers are asked to bring pop up tents for themselves and their students. Please remember sunscreen, chairs, umbrellas, extra snacks, drinks, and food.  Downtime entertainment for the students to engage in between launches may also be helpful. Rockets are subject to winds, weather and workmanship, all of which can stall a launch, and delay schedules.

Locals report that mosquito spray is a MUST.

Spectators are asked to register online for a ticket and sign a waiver before entering the event site. The registration link can be found on the Events page at SystemsGo.org .

Daily reports featuring schedules, school names, results, pictures and some editorial content will be posted during the event if information is available.

Daily picture uploads can be found on my Facebook page at: https://www.facebook.com/ginger.burow/

Or the SystemsGo Facebook page at:

SystemsGo Facebook page,

Please watch the SystemsGo website, Facebook page,  Twitter feed: and this blog for upcoming information on these events.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org . Take the time to get your school involved, the future of your students will be greatly benefited.

Hope to see you at the launches!

#RideTheSkies #texasrockettrail #Rockets2023 #EyesontheSkies #gettothepoint

Rockets 2022-SystemsGo at WSMR Sets a New Altitude Record with Brazoswood High School!!!

Two  rockets were up for testing at White  Sands Missile Range today. Fredericksburg and Brazoswood compromised the schedule. It was another early morning with meet time at the WSMR Rt 21 gate at 5:00 am.

A mishap while driving through the range created the first delay for our day. The Fredericksburg truck and trailer had an unfortunate meeting with an Oryx antelope while traveling  along with the convoy headed over to ABC -1. Luckily the damage to the truck was very minimal, mostly a couple of cracks in the left front bumper, but the Oryx did not fair as well. WSMR personnel stayed with the vehicle and the animal until authorities arrived to retrieve the animal and document the incident.

The rest of the group traveled on to the site and readied Brazoswood for launch. The accident and another unforeseen range event created an hour delay on our first T time for the day. Once all personnel were on site and the launch sequence started the day changed for the better.

Brazoswood was first up and had been loaded onto the rail the evening before, so it was just a matter of connecting the systems and doing prechecks. At 9:05 they launched and became the brand new WSMR SystemsGo altitude record holders. At first the rocket seemed a little slow in ascent, but then it literally screamed into the sky, sailing higher and higher. It eventually it left a contrail behind it which made it much easier to track. It was confirmed at an altitude of 49,523 MSL before nosing over and beginning it’s decent.  The range has a sea level of 4,000 feet which is deducted from the total altitude to figure the actual altitude, setting it at 45,523 feet, which is still the record for the program.

The chute did not deploy so it became a lawn dart about 4 kilometers down range. Chris Gardner took a couple of our support crew and they  went to dig it out. It was found and returned to the team.

The previous record held by Fredericksburg was 36,500 feet. This puts Brazoswood in the lead for  best launch and highest altitude. The program just dropped it’s height ceiling to 50,000 feet last year to accommodate changes in the range site we use at WSMR. The old ceiling was 100,000 feet which no one had even gotten close to reaching. Ironically Brazoswood almost broke the new ceiling with this launch.

Fredericksburg was the second launch of the day, and it was the second attempt for them to launch on this trip. At their first attempt yesterday, both the ignition and injection failed. After trouble shooting the problem and correcting it over night, they loaded up for a second chance. This time the rocket did leave the rail, but did not get much altitude before nosing over and returning to the ground about 25 yards behind the pad, where the impact popped off the nose cone and the engine compartment. The body of the vehicle continued north across the range for about 230 yards where it came to rest intact. All pieces were easily recovered and returned to the students. The students were excited that it left the rail and they were taking it home.

Fredericksburg and Brazoswood students helped pack up the pad site. After completion, Scott and Rebekah congratulated the two remaining teams on their successes and then introduced and spoke about the WSMR support team, explaining to the students all this group does so that all the students can get access to the range to test their rockets. Scott presented each team member with a SytemsGo cap as an appreciation for all their help and support.

At this point WSMR had released our airspace after Fredericksburg’s launch and now they called “mission complete” for the final time for Rockets 2022 at White Sands Missile Range.

Thanks to White Sands Missile Range for once again allowing this program to be tested on the range.

The schools and SystemsGo team members all headed back to the hotel for the evening. Fredericksburg’s group headed to eat and then slide at the White Sands Monument National Park. The eight SystemsGo team members grilled supper in the hotel court yard, played corn hole, 42 dominoes, debriefed, and just relaxed for the evening.

Tomorrow the SystemsGo team will be traveling home again. A much needed break for most is in the schedule. Afterwards, Scott Netherland, will be retiring from his post as Executive Director, and Rebekah Hyatt, will move into that role, and George Burns, will officially take on her current role as Program Director.

Rockets 2022 is officially at an end. We will see you again next year for the Texas Rocket Trail 2023. In the upcoming year watch for interesting high lights from the program. New things are happening all the time including the adding of new schools, states and countries in the program.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be greatly benefited.

#Rockets2021 #TexasRocketTrail #EyesonTheSkies #Ridetheskies #ItisRocketScience

Rockets 2022 Arrived at White Sands Missile Range Today, T-1 Site Set Up and FRR’s on Tap for Friday

The SystemsGo team left Fredericksburg in two shifts. One at 4:00 pm. Wednesday afternoon, and the second, Thursday morning, at 7:40 am. headed to White Sands Missile Range (WSMR) in New Mexico. The last group arrived at the El Paso, South Gate, of the base about 3:15 pm.

The early crew, Scott Netherland and Rebekah Hyatt, and George Burns, met with, Colonel Smart, Test Center Commander at 9:00 am Thursday morning for finalization of schedules, other information for the launches this weekend, and continued support for the program. The meeting went very favorably. Saturday and Sunday will continue to be our testing days as originally scheduled.

Schools and their personnel as well as student teams also traveled in today. The SystemsGo team met at the base hotel and grilled burgers and Bratts for supper and enjoyed some much needed down time and visiting before turning in early for the evening.

Fredericksburg High School’s group and Alamo Height’s group were just coming in to do some grilling of their own for supper as the SG team was retiring. It was a nice peaceful evening, with a few roaming thunderstorms in the area, which made for a cool breeze. Sure wish we could send some of those pop up heat storms to the Hill Country in Texas where we all know we need the rain.

Departure time from WSMR Route 21 is 7:00 am for all. Those staying on base will leave the hotel parking lot by 6:40 am. We will all proceed to ABC -1 launch site together via a range escort.

Portable restrooms are available at the site. Limited electricity is available. Each school is responsible for acquiring food and drinks for their group for all meals and snacks each day. Be sure you have plenty of water. Heat and dehydration are serious issues on the range in this desert heat.

All documentation should have been completed and turned in to Rebekah Hyatt, Thursday evening upon arrival. Those staying in Los Cruces will need to provide all necessary paperwork when we meet in the morning.

  • UXO briefing registry
  • WSMR waiver
  • SystemsGo waiver

All schools are traveling together to the range. Stage 2 and pressure checks will take place on site. Union Grove and Fredericksburg are first up unless they cannot complete on time. We will load the first two rockets on the rails before we leave the range, Friday evening. We must leave the range before 5:00 pm.

  • Friday, June 24th
    1. Site Set up ABC-1 8:00- 8:30 a.m.
      1. Depart for site from WSMR Rout 21 gate by 7:00 a.m.
    2. Leave the site with Fredericksburg and Union Grove on the rails by 5:00 pm.

Friday will be a busy day in preparation for Saturday’s launches. Look for Friday’s update for Saturday’s schedule of launches.

Good luck to all schools on your rocket tests.

Event details will continue to be available here. I will provide more information each day as to how the schedule and other event details will progress for the upcoming day and how launches went for the schools testing that previous day, if applicable. Pictures are not allowed on the range, but some pictures of teams getting ready to leave for the range with their vehicles might be available. If anything is available, I will post it for your viewing pleasure.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org . Take the time to get your school involved. The future of your students will be greatly benefited.

#Rockets2022 #SystemsGo #RideTheSky #Texasrockettrail #WSMRRocket #Launch2022 #EyesOnTheSkies #Laundher01

Rockets 2022-WSMR, Saturday Launch Day Report

Three of four schools tested rockets at White Sands Missile Range today. Fredericksburg, Alamo Heights and Union Grove comprised that list.  The fourth school, Brazoswood will be first up tomorrow morning.

An one hour delay, five minutes before our first T time began a series of events today, that left our clock too short to complete our mission today. Union Grove was on the rail ready for launch when the range called the delay. After it’s completion, the crew evacuated and launched the UG rocket.

Union Grove High School proved to be the big winner of the day, because they were the only school to leave the rail. They climbed to 15,400’ before rolling over and returning to the range ballistic. It was a beautiful flight. WSMR personnel did recover it. After digging it out they brought it back to the site in one large piece and several smaller. It was a good day for Union Grove! It was a good start to the day with the first launch as a successful lift off. Congratulations on another good launch.

Fredericksburg was the second launch. They were on the old rail and ready for launch when the hydraulic ram on the rail failed. Fredericksburg had to be off loaded to the newer rail while team members trouble shot the issues with the old rail. unfortunately the old rail was not available for further launches today, and may not be this round.

Fredericksburg went for fill after relocating, but developed a permanent venting. The team decided to go for launch as it was. Launch sequence was initiated and the vehicle failed to lift off. Pad reported that it had only minor ignition and no injection. The rocket was removed from the rail and given back to the students for trouble shooting to see if they think they could repair it and go for a second T time.

Alamo Heights loaded onto the rail next. At 3:36 they attempted their launch. Their vehicle also failed to leave the rail. Initially pad reported ignition, injection or any burn or smoke. Several minutes later, as the bunker crew was evaluating the possibility resetting and attempting a second launch, the nitrous lines failed and blew apart leaving the vehicle inoperable.

At this point WSMR called complete and released our airspace for the day. Alamo Heights was removed from the rail for evaluation. They determined later that they could not repair and relaunch the rocket.

Brazoswood was supposed to be the final launch of the day. This year’s launch is also only the second time this school has been to WSMR. Instead of closing out the day, they will open launches on Sunday, as we continue into our contingency window.

Test Center Commander, Colonel Smart, from White Sands Missile Range, visited the launch site today.

Mission was called complete by WSMR at 5:16 p.m. today as the team and schools pulled away from the site.

The convoy slowed briefly along the route home to see several groups of Oryxes grazing on the range, as well as a double rainbow spreading across the sky in front of the line of cars retreating back to civilization.

Tomorrow’s schedule will be much like today’s. A Very early start in order to meet our 8:00 am. T times. Breakfast bags provided by the hotel will be ready for pickup by 4:30. The convoy will meet at WSMR Rt 21 by 5:00 am.

  • Sunday, June 26th
    1. Contingency Launch Day (Two Rockets, if possible, at 2-hour intervals.)
    2. Depart from WSMR Rt 21 gate by 5:00 a.m. for 6:30 a.m. arrival on site.
    3. Projected launch schedule:
      • T1 8:00 am. -Brazoswood
      • T2 10:00 am. -Fredericksburg
      • T3 12:00 pm. – Open
      • 3:30 pm. – Range Time Ends

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be greatly benefited.

#Rockets2022 #TexasRocketTrail #EyesonTheSkies #Ridetheskies #ItisRocketScience

White Sands Missile Range Hosts SystemsGo’s 2022 Goddard Level Rockets in 5 Days

White Sands Missile Range has been hosting the SystemsGo Rocket Program for over 20 years, and the tradition continues for the 2022 season. Changes have been made over the years, including moving from the original launch site which was West Center 50 (WC50) to alternate range ABC1. This change came about after the COVID shut down of 2020.  Back logged government contracts took precedence for the larger range, necessitating the program’s relocation for continued support at the base.

The move to the smaller range also required the altitude cap for the rockets to be adjusted. The smaller site meant less than the 20-mile radius the program previously had available for these test vehicles to travel and stay within their parameters. The original height cap was 100,000 feet. The new cap instituted last year is 50,000 feet. ABC-1 does not have a large bunker, so only essential launch personnel stay on site, and the SG staff evacuate out five miles for launches. Students and teachers are taken to a secure location known as Tula G, which is further down range where they watch the launches on screen inside a designated facility. Due to this change, parents are no longer allowed to come. In years past parents watched from the theater at Mission Control. Unfortunately, volunteer staffing of base personnel for this is no longer available.

Stage 1 and 2 will take place on the range this year. In years past with the exception of last year, this was normal progression. Last year the Alamogordo High School hosted this part of the event. Stage 1 and 2 will take place while the SG team sets up the pad, launch rails, fill and fire system and electronics trailers. Rockets need to be complete by the end of the day on Friday as there will be very little latitude between T times to complete work on the vehicles. We are to be Mission Complete by 5:00 p.m. on Saturday.

Sunday is a contingency day, but preferably it should not be no more than a site clean up day if needed that morning . Provided that we accomplish this early the remainder of the day’s activities will be decided at that time.

Due to higher prices for accommodations, the SG team and schools will stay at a hotel on the base.  Since we will be approaching from the Las Cruces side of the range instead of Tula Rosa, travel time will increase as speeds are slower, most are two lane roads, and range police are strict. Please check with your teachers if you need information about our accommodations, as I do not think it is appropriate to post it here since it is not outside the base. For those who are still staying off base, be sure to keep up with schedules and times as they group will need to move together with an escort through the base.

Launches are scheduled for June 25th with a contingency/cleanup day for June 26th. The team will travel out to WSMR on Wednesday, June 23rd, and back home again on the 27th.

There are four schools scheduled to launch four rockets. These include:

  • Alamo Heights
  • Brazoswood
  • Fredericksburg
  • Union Grove

The current launch schedule is as follows:

  • Thursday, June 23rd
    1. Travel Day
  • Friday, June 24th
    1. Site Set up ABC-1 8:00- 8:30 a.m.
    2. Depart for site from Main gate by 7:00 a.m. start time.
    3. Leave the site with Fredericksburg and Union Grove on the rails.
  • Saturday, June 25th
    1. Launch Day (All Four Rockets, if possible, at 2-hour intervals.)
    2. Depart from Main gate by 5:00 a.m. for 6:30 a.m. arrival on site.
    3. Projected launch schedule:
      • T1 8:00 a.m. -Union Grove
      • T2 10:00 a.m. -Fredericksburg
      • T3 12:00 p.m. -Alamo Heights
      • T4 2:00 p.m. – Brazoswood
      • 5:00 p.m. – Range Time Ends
  • Sunday, June 26th
    1. Contingency Launch Day/Cleanup/Fun Day/ Travel (What happens depends with launches Saturday.)
  • Monday, June 27th
    1. Travel Day

The Goddard level rockets, which are the capstones of the SystemsGo program and the culmination of all the skills the students have learned throughout their years in the STEM program. This marks the final senior project for the schools that participate in for the SystemsGo program.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be benefited.

#Rockets2022 #SystemsGo #Launcher01 #RideTheSky #Texasrockettrail #EyesOnTheSkies