White Sands Missile Range SystemsGo Rocket Program 2024

White Sands Missile Range is once again hosting the SystemsGo Rocket Program again for its season end launches. This year three schools will be traveling to New Mexico to test their rockets at White Sands Missile Range, they include: Alamo Heights HS, Brazoswood HS, and Union Grove HS.

June 14th through June 16th are the dates for this year’s WSMR launch.  The SystemsGo team and schools will be traveling to Alamogordo, New Mexico for lodging on June 13th. Early on the 14th, preparations at the site will be made with the goal of launching all three rockets Saturday.  The 16th, Sunday, is our contingency day, but the hope is that it will not be needed. Sunday is Father’s Day and WSMR personnel would prefer not to work and we would love to be on the road home.

We continue to launch from range ABC1. This range required the altitude cap for the rockets to be adjusted from the original height cap which was 100,000 feet. The current cap instituted three years ago is 50,000 feet. ABC-1 does not have a large bunker, so only essential launch personnel stay on site, and the SG staff evacuate out five miles for launches. Students and teachers are taken to a secure location known as Tula G, which is further down range where they watch the launches on screen inside a designated facility.

There will be tents on the range, the same as last year. Rockets need to be complete by the end of the day on Friday.

The T-1schedule on Saturday will be very tight. Range time begins at 7:00 am and ends at 4:00 pm. The range is Hot all day for us, which translates to as soon as we can reset and be ready to launch again, WSMR is ready to assist. This should make keeping the schedule and sending all three rockets skyward a viable task for Saturday.

If Mission is Complete on Saturday evening, then evening activities may include some White Sands National Park dune sledding.

SystemsGo team members will be residing at the Quality Inn and Suites in Alamogordo this year.

There are three schools scheduled to launch their rockets. These include:

  • Alamo Heights
  • Brazoswood
  • Union Grove

The current launch schedule is as follows:

  • Thursday, June 13th
    1. Travel Day
    2. Pressure Checks and FRRs that evening at the hotels.
    3. Security checks of all Form 5000s
  • Friday, June 14th
    1. Site Set up ABC-1 7:00
    2. Depart for site from hotel–TBA
    3. Complete all rockets.
    4. 3:00 p.m. Leave the site with Alamo Heights and Brazoswood on the rails.
  • Saturday, June 15th
    1. Launch Day (Three Rockets, barring any schedule changes by WSMR.)
    2. Depart from hotel for arrival on site–TBA
    3. Projected launch schedule:
      • T1 8:00 a.m.
      • T2 9:00 a.m.
      • T3 11:00 a.m.
  • Airspace Ends – 4:00 p.m.
  • Pack site
  • Evening Activities as time allows.
  • Sunday, June 16th
    1. Travel Day-Contingency Day only if absolutely needed. WSMR does not want to work on Father’s Day.
  • Monday, June 17th
    1. Travel Day-Hopefully we are already home.

The Goddard level rockets, which are the capstones of the SystemsGo program and the culmination of all the skills the students have learned throughout their years in the STEM program. This marks the final senior project for the schools that participate in for the SystemsGo program.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be benefited.

#Rockets2024 #SystemsGo #Launcher01 #RideTheSky #Texasrockettrail #EyesOnTheSkies #TexasToNewMexicoRocketTrail #RideTheSky2024

Rockets 2024, Friday, May 3, Central Texas/Stonewall Weather Weary Launch Report

Rockets 2024, Central Texas/Stonewall Edition, continued today. The original schedule listed 27 rockets for today. 23 were left from yesterday that were unable to launch due to weather. The plan had been to try to get some of yesterday’s off the rails while waiting for today’s to move through from Stage 1 to Stage 3. The weather again did not cooperate so when a launch opportunity finally opened up at 2:20 this afternoon we started with those who were present and ready from today’s docket.

The first volley consisted of 3 successful launches and recoveries. The next volley of 4 involved three from today and one, #68 from yesterday. All had beautiful flights, but unfortunately went unrecovered as 2 are believed to be on the Iron Game Ranch and 2 more on the Klein property across the road. We did not have permission to enter those properties today, but will later in the weekend and they may be recovered at that time.

Tomorrow only 7 rockets are on the schedule, but we still have 22 left from Thursday, and 17 left from today. That sets the grand total still to be launched to 46. Once again if we get better weather and an opening in the clouds before those 7 for tomorrow are ready, we will fill in the time with some of our holdovers from yesterday and today. If our 7 are ready when the sky is ready, then they are up first. Either way we will try to launch as many as weather permits tomorrow.

Program Director, Rebekah Hyatt has already made plans with teachers, volunteers(as available) and land owners to launch on Monday and Tuesday to try to get all vehicles tested if weather permits. Hopefully it does not come to that, but unfortunately the current weather reports are not in our favor. After tuesday the team has to transition to Anahuac/Smith Point for the SETX launches.

Test vehicles like these often push the time schedules all on their own. Vent hoses, o rings, altimeter switches, and a host of other issues can send a rocket on numerous trips from pad back to Stage 3 and back again. Weather, as we have all seen again this year effects the schedule as well. We have been under Severe weather watches all weekend, and the possibility is still there. It has not been on our side so far this weekend, let us hope tomorrow shows us a brighter day, will hold off the rain and lift the cloud ceiling until we are done. The team would like to call it complete and not go into one or maybe more days of contingency.

After the completion of this weekend’s launches be it tomorrow or later, the Texas Rocket Trail will move to Smith Point in Anahuac, down in the Houston area for the final leg of the season before the spring launches end for another year.

Pictures from the day’s events are on SystemsGo Facebook page, as well as my Facebook page. They can be found here:

https://www.facebook.com/SystemsGoEducation/

https://www.facebook.com/ginger.burow

Tomorrow’s launches will continue at the Sammy Segner Ranch on Double Horn Road with Stages 1 and 2 will be at the Stonewall Chamber of Commerce building.

Restrooms and wash stations will be provided at the launch site. Spectators are welcomed this year. Teachers are asked to bring pop-up tents for themselves and their students. Please remember sunscreen, chairs, umbrellas, extra snacks, drinks, and food. Downtime entertainment for the students to engage in between launches may also be helpful.

The look on your students’ faces when their vehicle goes up and then is recovered is priceless. If they know you are watching and supporting them, then it is even more memorable. If you are not on site, then shoot them a text, letting them know you are watching online.

The Central Texas/Stonewall launch dates, Livestream links and schools are also listed here for your convenience or can be found at http://www.systemsgo.org/events/ .

Central Texas/Stonewall:

  • Saturday, May 4, 2024
  • Launch Site: 2187 Double Horn Road, Stonewall, Texas 78671
  • Stage 1 & 2 at Stonewall Chamber of Commerce: 250 Peach Street, Stonewall, TX 78671
  • Central Texas-Stonewall 2024 Flight Schedule
  • Saturday, May 4, 2024
  • School Name / Teacher 1/1 Trans
  • London                            
  • Toni Castle 1 2
  • Alamo Heights          
  • Colin Lang 2 2                        
  • 2   Schools Launching
  • Totals 3 4
  • Total Rockets 7
  • Schools participating this year in Stonewall: Fabens HS, Fredericksburg HS, Johnson HS, Hamilton HS, Kingwood HS, Marble Falls HS, Roosevelt HS, Georgetown HS, Atascocita HS, Victoria East HS, Harleton HS, London HS, New Tech Odessa HS, Alamo Heights HS, Union Grove HS, McGregor HS, Canon City HS
  • 15 rockets slated for testing on Saturday.
  • A Livestream for each launch will be provided and will be available at www.systemsgo.org on the Events page each day.

The sites will be open to admittance for students and teachers only at 6:00 a.m. Projected start time for launches is 10:00 a.m. All is contingent on test vehicle readiness and ability to pass Stages 1 and 2. Mission Control will be ready for Stage 3 checks by 8:00 a.m.

More details will be available here each day. Reports featuring schedules, school names, pictures, and editorial content will be posted during the events if information is available.

Please watch the SystemsGo website, SystemsGo Facebook page,  SystemsGo Twitter feed: https://twitter.com/SystemsGoNews and this blog for upcoming information on these events.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org . Take the time to get your school involved. Your students’ futures will benefit.

Hope to see you at the launches!

#RideTheSkies #TexasRocketTrail #Rockets2024 #EyesToTheSkies

Rockets 2023 Arrived in Alamogordo, Thursday for WSMR Launches on Saturday

The SystemsGo team left Fredericksburg at in two shifts, one at 6:00 a.m. and the second at 8:30 a.m. this morning headed to Alamogordo, for lodging for White Sands Missile Range (WSMR) rocket launches in New Mexico. Schools from Union Grove, Alamo Heights and Brazoswood also traveled to Alamogordo today to meet and begin preparations for launches this Saturday

The early crew, Rebekah Hyatt and George Burns, set up by 3:00 p.m.in the parking lot of the Quality Inn and Suites to preform pressure and FRR checks for Union Grove and Alamo Heights teams. At 8:45 p.m. the SystemsGo team walked to Applebee’s for dinner as the students from Alamo Heights were still evaluating their rocket and finishing configuration.

Portable restrooms are available at the site. Limited electricity is available. Each school is responsible for acquiring food and drinks for their group for all meals and snacks each day, except lunch on launch day will be provided by WSMR.

All documentation was completed and turned in to Rebekah Hyatt, Thursday evening upon arrival.

  • UXO, Wildlife, and Driving in WSMR briefing registry
  • WSMR waiver
  • SystemsGo waiver
  • Medical Release Forms

Be prepared to show ID’s at the security check at the gate in the morning.

There are three schools scheduled to launch four rockets. These include:

  • Union Grove
  • Alamo Heights
  • Brazoswood

The current launch schedule is as follows:

  • Friday, June 23rd
    1. Depart for site from hotel by 7:15 a.m.
    2. Meet at Tula Gate for Security Checks at 8:00 a.m.
    3. Alamo Heights and Union Grove will be in our caravan from the hotel. Brazoswood will meet us at the Tula Gate.
    4. Travel to ABC-1 at 9:00 a.m.
    5. Site Set up at ABC-1 upon arrival.
    6. Complete all rockets.
    7. Leave the site with Union Grove and Alamo Heights on the rails and Brazoswood completed and ready to load the rail by 5:00 p.m.
  • Saturday, June 24th
  • Launch Day (Three Rockets, barring any schedule changes by WSMR.)
  • Depart from Hotel by 5:15 a.m. for 6:00 a.m. arrival at Tula Gate for Security checks.
  • Depart Gate to ABC-1 6:30 a.m.
  • Projected launch schedule:
    • T1 8:00 a.m. –
    • T2
    • T3
    • All rockets launched by 2:00 p.m.
    • Break for Lunch 2:00 p.m. – 3:00 p.m.
    • Range Time Ends – 4:00 p.m.
  • Sunday, June 25th
  • Contingency Day/Cleanup/Fun Day/ Travel (To be determined.)
  • Monday, June 26th
  • Travel Day

The schedule as seen above is a preliminary estimate, and though accurate as stated by Program Director, Rebekah Hyatt, at the moment, is subject to changes and adjustments as needed per WSMR necessities.

The Goddard level rockets, which are the capstones of the SystemsGo program and the culmination of all the skills the students have learned throughout their years in the STEM program. This marks the final senior project for the schools that participate in for the SystemsGo program.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be benefited.

#Rockets2023 #SystemsGo #Launcher01 #RideTheSky #Texasrockettrail #EyesOnTheSkies #TexasToNewMexicoRocketTrail

2023 Marks 25 Years White Sands Missile Range Hosts Student Rockets

2023 is a year of milestones for the Fredericksburg based STEM rocket program beginning with White Sands Missile Range hosting the SystemsGo Rocket Program again for its season end launches. This event marks the 25th year the STEM based program has brought high school seniors to the Army Base to test the program’s highest-level rockets, known as Goddard. It would have marked 25 consecutive years, but COVID took out 2020 putting the numbers behind by a year. The program took its first rocket from Fredericksburg High School to WSMR in 1999. The nonprofit organization supporting this STEM program in schools officially began in June of 2003, making this 2023 season its 20th Anniversary as well. This year three schools will be traveling to New Mexico to test their rockets at White Sands Missile Range, they include: Alamo Heights HS, Brazoswood HS and Union Grove HS.

June 23rd through June 25th are the dates for this year’s WSMR launch.  The SystemsGo team and schools will be traveling to Alamogordo, New Mexico for lodging on June 22nd. Early on the 23rd, preparations at the site will be made with the goal of launching all three rockets Saturday afternoon.  The 25th is our contingency day, but it is only a contingency for completing cleanup at the site, or if WSMR must delay our launches. It will not be a day to recycle rockets that fail.

We continue to launch from range ABC1. This range required the altitude cap for the rockets to be adjusted from the 20-mile radius the program previously had available for these test vehicles to travel and stay within their parameters. The original height cap was 100,000 feet. The current cap instituted two years ago is 50,000 feet. ABC-1 does not have a large bunker, so only essential launch personnel stay on site, and the SG staff evacuate out five miles for launches. Students and teachers are taken to a secure location known as Tula G, which is further down range where they watch the launches on screen inside a designated facility. Parents are no longer allowed to come, since the theater at Mission Control is no longer the viewing area. Volunteer staffing of base personnel for this has still not resumed.

Schools are asked to arrive early on the 22nd in Alamogordo to do pressure checks with as little time spent on configuration as possible. At least two vehicles need to have this stage complete before heading down range on the 23rd.  Preferably very little time will be spent on assembly on the 23rd. Some weight, CG, and FFR verification can be done if needed downrange the 23rd.  There will be tents on the range, the same as last year. Rockets need to be complete by the end of the day on Friday.

The first T time on Saturday will be 8:00 a.m. After that the range is Hot all day for us, which translates to as soon as we can reset and be ready to launch again, WSMR is ready to assist. This should make keeping the schedule and sending all three rockets skyward a viable task for Saturday.

WSMR personnel, including Test Center Commander, Colonel Shawanta Smart, and Range Operator, Lori Leyva, will be on site during the launches. WSMR will be providing lunch for all participants. Colonel Smart began her command in August of 2021, making this her second rocket season with the program. She stopped in last year for a brief visit, but plans to be onsite to see more of how the program operates. Ms. Leyva will be retiring after this year. Her service in coordinating SystemsGo and WSMR in launch efforts has been extremely beneficial to the program over the years she has been with us. SystemsGo will be making special presentations during the lunch break.

Saturday is a contingency day, but preferably it should be no more than a site cleanup day if needed that morning. Provided that we accomplish this early the remainder of the day’s activities will be decided at that time.

SystemsGo team members will be residing at the Quality Inn and Suites in Alamogordo this year.

There are three schools scheduled to launch four rockets. These include:

  • Union Grove
  • Alamo Heights
  • Brazoswood

The current launch schedule is as follows:

  • Thursday, June 22nd
    1. Travel Day
    2. Pressure Checks and FRRs that evening at the hotels.
    3. Security checks of all Form 5000s
  • Friday, June 23rd
    1. Site Set up ABC-1 9:00- 9:30 a.m.
    2. Depart for site from hotel by 7:45 a.m.
    3. Complete all rockets.
    4. Leave the site with Union Grove and Alamo Heights on the rails.
  • Saturday, June 24th
    1. Launch Day (Three Rockets, barring any schedule changes by WSMR.)
    2. Depart from hotel by 4:45 a.m. for 6:00 a.m. arrival on site.
    3. Projected launch schedule:
      • T1 8:00 a.m. –
      • T2
      • T3
      • Break for Lunch 2:00 p.m. – 3:00 p.m.
      • Range Time Ends – unspecified currently.
  • Sunday, June 25th
    1. Contingency Day/Cleanup/Fun Day/ Travel (To be determined.)
  • Monday, June 26th
    1. Travel Day

The schedule as seen above is a preliminary estimate, and though accurate as stated by Program Director, Rebekah Hyatt, at the moment, is subject to changes and adjustments as needed once the entire group is in New Mexico.

The Goddard level rockets, which are the capstones of the SystemsGo program and the culmination of all the skills the students have learned throughout their years in the STEM program. This marks the final senior project for the schools that participate in for the SystemsGo program.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be benefited.

#Rockets2023 #SystemsGo #Launcher01 #RideTheSky #Texasrockettrail #EyesOnTheSkies #TexasToNewMexicoRocketTrail

Rockets 2023, Friday, May 5, Central Texas/Stonewall Launch Report

Rockets 2023, Central Texas/Stonewall Edition, continued today. The original schedule listed 26 rockets for today. Three rockets aborted, bringing the total launched to 23.

Georgetown arrived at Stage 3 first with 7 vehicles, making the first full volley all theirs, with rockets in the air starting at 10:51 a.m. Mission Complete was at 7:07 p.m. It was a slightly longer day today.

Tomorrow only 15 rockets are on the schedule, as compared to Thursday’s 18 and today’s 23. Numbers do not mean a thing when it comes to rockets. Tomorrow could be a short day, as is the hope, or another long one. Test vehicles like these quite often push the time schedules. Weather effects the schedule as well. We have been under Severe weather watches all weekend, and the possibility is still there. It has been on our side so far, let us hope tomorrow will hold off until we are done as well. The team would like to call it complete early.

After tomorrow, the Texas Rocket Trail will move to Smith Point in Anahuac, down in the Houston area for the final leg of the season before the spring launches end for another year.

An author and a photographer from Texas Coop Magazine were onsite today, watching the program, taking photos and talking to people involved in the program. They plan a future article for the program in an upcoming edition of the magazine.

Past SystemsGo student and current NASA Flight Director for the Jet Propulsion Laboratory, Bekah Sosland Siegfriedt, brought her family out to watch today’s event. She is responsible for putting The Perseverance Rover on Mars.

Program originator, Brett Williams, also stopped in today.

Pictures from the day’s events are on SystemsGo Facebook page, as well as my Facebook page. They can be found here:

https://www.facebook.com/SystemsGoEducation/

https://www.facebook.com/ginger.burow

Tomorrow’s launches will continue at the Sammy Segner Ranch on Double Horn Road with Stages 1 and 2 will be at the Stonewall Chamber of Commerce building.

Restrooms and wash stations will be provided at the launch site. Spectators are welcomed this year. Teachers are asked to bring pop-up tents for themselves and their students. Please remember sunscreen, chairs, umbrellas, extra snacks, drinks, and food. Downtime entertainment for the students to engage in between launches may also be helpful.

The look on your students’ faces when their vehicle goes up and then is recovered is priceless. If they know you are watching and supporting them, then it is even more memorable. If you are not on site, then shoot them a text, letting them know you are watching online.

The Central Texas/Stonewall launch dates, Livestream links and schools are also listed here for your convenience or can be found at http://www.systemsgo.org/events/ .

Central Texas/Stonewall:

  • Saturday, May 6, 2023
  • Launch Site: 2187 Double Horn Road, Stonewall, Texas 78671
  • Stage 1 & 2 at Stonewall Chamber of Commerce: 250 Peach Street, Stonewall, TX 78671
  • Central Texas-Stonewall 2023 Flight Schedule for Saturday
Saturday, May 6, 2023
School Name / Teacher1/1Trans
London                             Toni Castle11
Alamo Heights           Colin Lang32
Canon City                    Chad Ford22
New Tech Odessa      Maria Lopez4 
   
   
 4
Schools Launching
Totals105
Total Rockets15
  • Schools participating this year in Stonewall: Fabens HS, Fredericksburg HS, Johnson HS, Hamilton HS, Kingwood HS, Marble Falls HS, Roosevelt HS, Georgetown HS, Atascocita HS, Victoria East HS, Harleton HS, London HS, New Tech Odessa HS, Alamo Heights HS, Union Grove HS, McGregor HS, Canon City HS
  • 15 rockets slated for testing on Saturday.
  • A Livestream for each launch will be provided and will be available at www.systemsgo.org on the Events page each day.

The sites will be open to admittance for students and teachers only at 6:00 a.m. Projected start time for launches is 9:00 a.m. All is contingent on test vehicle readiness and ability to pass Stages 1 and 2. Mission Control will be ready for Stage 3 checks by 8:00 a.m.

More details will be available here each day. Reports featuring schedules, school names, pictures, and editorial content will be posted during the events if information is available.

Please watch the SystemsGo website, SystemsGo Facebook page,  SystemsGo Twitter feed: https://twitter.com/SystemsGoNews and this blog for upcoming information on these events.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org . Take the time to get your school involved. Your students’ futures will benefit.

Hope to see you at the launches!

#RideTheSkies #TexasRocketTrail #Rockets2023 #EyesToTheSkies

Rockets 2022 Arrived at White Sands Missile Range Today, T-1 Site Set Up and FRR’s on Tap for Friday

The SystemsGo team left Fredericksburg in two shifts. One at 4:00 pm. Wednesday afternoon, and the second, Thursday morning, at 7:40 am. headed to White Sands Missile Range (WSMR) in New Mexico. The last group arrived at the El Paso, South Gate, of the base about 3:15 pm.

The early crew, Scott Netherland and Rebekah Hyatt, and George Burns, met with, Colonel Smart, Test Center Commander at 9:00 am Thursday morning for finalization of schedules, other information for the launches this weekend, and continued support for the program. The meeting went very favorably. Saturday and Sunday will continue to be our testing days as originally scheduled.

Schools and their personnel as well as student teams also traveled in today. The SystemsGo team met at the base hotel and grilled burgers and Bratts for supper and enjoyed some much needed down time and visiting before turning in early for the evening.

Fredericksburg High School’s group and Alamo Height’s group were just coming in to do some grilling of their own for supper as the SG team was retiring. It was a nice peaceful evening, with a few roaming thunderstorms in the area, which made for a cool breeze. Sure wish we could send some of those pop up heat storms to the Hill Country in Texas where we all know we need the rain.

Departure time from WSMR Route 21 is 7:00 am for all. Those staying on base will leave the hotel parking lot by 6:40 am. We will all proceed to ABC -1 launch site together via a range escort.

Portable restrooms are available at the site. Limited electricity is available. Each school is responsible for acquiring food and drinks for their group for all meals and snacks each day. Be sure you have plenty of water. Heat and dehydration are serious issues on the range in this desert heat.

All documentation should have been completed and turned in to Rebekah Hyatt, Thursday evening upon arrival. Those staying in Los Cruces will need to provide all necessary paperwork when we meet in the morning.

  • UXO briefing registry
  • WSMR waiver
  • SystemsGo waiver

All schools are traveling together to the range. Stage 2 and pressure checks will take place on site. Union Grove and Fredericksburg are first up unless they cannot complete on time. We will load the first two rockets on the rails before we leave the range, Friday evening. We must leave the range before 5:00 pm.

  • Friday, June 24th
    1. Site Set up ABC-1 8:00- 8:30 a.m.
      1. Depart for site from WSMR Rout 21 gate by 7:00 a.m.
    2. Leave the site with Fredericksburg and Union Grove on the rails by 5:00 pm.

Friday will be a busy day in preparation for Saturday’s launches. Look for Friday’s update for Saturday’s schedule of launches.

Good luck to all schools on your rocket tests.

Event details will continue to be available here. I will provide more information each day as to how the schedule and other event details will progress for the upcoming day and how launches went for the schools testing that previous day, if applicable. Pictures are not allowed on the range, but some pictures of teams getting ready to leave for the range with their vehicles might be available. If anything is available, I will post it for your viewing pleasure.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org . Take the time to get your school involved. The future of your students will be greatly benefited.

#Rockets2022 #SystemsGo #RideTheSky #Texasrockettrail #WSMRRocket #Launch2022 #EyesOnTheSkies #Laundher01

White Sands Missile Range Hosts SystemsGo’s 2022 Goddard Level Rockets in 5 Days

White Sands Missile Range has been hosting the SystemsGo Rocket Program for over 20 years, and the tradition continues for the 2022 season. Changes have been made over the years, including moving from the original launch site which was West Center 50 (WC50) to alternate range ABC1. This change came about after the COVID shut down of 2020.  Back logged government contracts took precedence for the larger range, necessitating the program’s relocation for continued support at the base.

The move to the smaller range also required the altitude cap for the rockets to be adjusted. The smaller site meant less than the 20-mile radius the program previously had available for these test vehicles to travel and stay within their parameters. The original height cap was 100,000 feet. The new cap instituted last year is 50,000 feet. ABC-1 does not have a large bunker, so only essential launch personnel stay on site, and the SG staff evacuate out five miles for launches. Students and teachers are taken to a secure location known as Tula G, which is further down range where they watch the launches on screen inside a designated facility. Due to this change, parents are no longer allowed to come. In years past parents watched from the theater at Mission Control. Unfortunately, volunteer staffing of base personnel for this is no longer available.

Stage 1 and 2 will take place on the range this year. In years past with the exception of last year, this was normal progression. Last year the Alamogordo High School hosted this part of the event. Stage 1 and 2 will take place while the SG team sets up the pad, launch rails, fill and fire system and electronics trailers. Rockets need to be complete by the end of the day on Friday as there will be very little latitude between T times to complete work on the vehicles. We are to be Mission Complete by 5:00 p.m. on Saturday.

Sunday is a contingency day, but preferably it should not be no more than a site clean up day if needed that morning . Provided that we accomplish this early the remainder of the day’s activities will be decided at that time.

Due to higher prices for accommodations, the SG team and schools will stay at a hotel on the base.  Since we will be approaching from the Las Cruces side of the range instead of Tula Rosa, travel time will increase as speeds are slower, most are two lane roads, and range police are strict. Please check with your teachers if you need information about our accommodations, as I do not think it is appropriate to post it here since it is not outside the base. For those who are still staying off base, be sure to keep up with schedules and times as they group will need to move together with an escort through the base.

Launches are scheduled for June 25th with a contingency/cleanup day for June 26th. The team will travel out to WSMR on Wednesday, June 23rd, and back home again on the 27th.

There are four schools scheduled to launch four rockets. These include:

  • Alamo Heights
  • Brazoswood
  • Fredericksburg
  • Union Grove

The current launch schedule is as follows:

  • Thursday, June 23rd
    1. Travel Day
  • Friday, June 24th
    1. Site Set up ABC-1 8:00- 8:30 a.m.
    2. Depart for site from Main gate by 7:00 a.m. start time.
    3. Leave the site with Fredericksburg and Union Grove on the rails.
  • Saturday, June 25th
    1. Launch Day (All Four Rockets, if possible, at 2-hour intervals.)
    2. Depart from Main gate by 5:00 a.m. for 6:30 a.m. arrival on site.
    3. Projected launch schedule:
      • T1 8:00 a.m. -Union Grove
      • T2 10:00 a.m. -Fredericksburg
      • T3 12:00 p.m. -Alamo Heights
      • T4 2:00 p.m. – Brazoswood
      • 5:00 p.m. – Range Time Ends
  • Sunday, June 26th
    1. Contingency Launch Day/Cleanup/Fun Day/ Travel (What happens depends with launches Saturday.)
  • Monday, June 27th
    1. Travel Day

The Goddard level rockets, which are the capstones of the SystemsGo program and the culmination of all the skills the students have learned throughout their years in the STEM program. This marks the final senior project for the schools that participate in for the SystemsGo program.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be benefited.

#Rockets2022 #SystemsGo #Launcher01 #RideTheSky #Texasrockettrail #EyesOnTheSkies

Rockets 2021: Travel to White Sands Today, Stage 2 and Range Set Up Information For Tomorrow, Friday

The SystemsGo team left Fredericksburg at in two shifts this morning headed to White Sands Missile Range (WSMR) in New Mexico. The last group arrived in Alamogordo at about 5:30 pm. after a late start due to a bad tire on the van. Luckily Patrick Krauskopf at 7 Day Tire was able to replace it get us on the way by 9:00 am.

The early crew, Scott Netherland and Rebekah Hyatt, met with, Brigadier General Eric D. Little, at Range Control for finalization of schedules, other information for the launches this weekend, and continued support for the program. The meeting went very favorably but they will not be able to accommodate any launches on Friday, just set up at the range. Saturday and Sunday will continue to our testing days as originally scheduled.

The group walked to Chili’s for dinner and discussion about tomorrow’s events and schedules. The team plans to leave for the Alamogordo High School tomorrow morning at 6:30 am.

Schools and other personnel also traveled in today. Tomorrow all Stage 2 checks will begin by 7:00 am. All schools and personnel are asked to be there on time and ready to work.  Schools are asked to bring their own weights to simulate load cells and nitrous oxide loads. All other needed equipment for pressure checks will be there. Load cells will be available for sale for those that need one.

Electricity and restrooms are available at the high school during the day. Each school is responsible for acquiring food and drinks for their group for all meals and snacks each day.

All documentation was completed and turned in to Rebekah Hyatt, Thursday evening upon arrival.

  • UXO briefing registry
  • WSMR waiver
  • SystemsGo waiver

Friday upon notification from WSMR, SystemsGo Staff, pertinent personnel, and students from the first two rocket teams, who have cleared Stage 2, will be going down range to set up the rails and equipment for launch. They will also load these two rockets onto the rails that evening, ready for testing, Saturday morning,

In the event that all schools are through Stage 2 and rockets are finished, then all groups will go at that time and transport rockets to the site. Therefore the earlier vehicles are completed the more chance this can be accomplished.  If this is not accomplished then the rest will come in a later group. 

The current launch order as per the draw, but contingent on readiness, are as follows:

  • Brazoswood
  • Union Grove
  • Booker T Washington
  • Alamo Heights

The current schedule has launches beginning by 8:00 am Saturday morning.

Here is the address for the high school for Stage 2 on Friday morning. It is located just east of the Walmart.

Tomorrow will be an early morning, and a busy day in preparation for Saturday’s launches.

Good luck to all schools on your rocket tests.

Event details will continue to be available here. I will provide more information each day as to how the schedule and other event details will progress for that day and how launches went for the schools testing the previous day. Pictures are not allowed on the range, but some pictures of teams getting ready to leave for the range with their vehicles might be available. If anything is available, I will post it for your viewing pleasure.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org . Take the time to get your school involved. The future of your students will be greatly benefited.

#Rockets2021 #SystemsGo #RideTheSky #Texasrockettrail #WSMRRocketLaunch2021

Goddard Level Rockets Return to The Skies Once Again in 15 Days, Rockets 2021

The Goddard level rockets, which are the capstones of the SystemsGo program and the culmination of all the skills the students learned throughout their years in the program are set to launch June 25-27. This marks the final senior project for the schools that participate in this level of the program, and the last big event of the Rockets 2021 season.

Four schools are scheduled for testing at White Sands Missile Range (WSMR) .  The numbers of schools able to participate in this part of the program this year are significantly down. This is again due to COVID creating learning and participation barriers for students in both the 2020 and 2021 school years. Lack of in class time made it hard for students to finish large projects like these. 

Due to shutdowns for COVID last year, White Sands Missile Range is also backlogged with military contracts that take priority. They are still accommodating our group but our regular range, WC-50 is under heavy contract and will not be available. We will instead be located on a smaller range, ABC-1. This poses several new restrictions for the group.

The first of these is an even more limited number of personnel allowed on the range during set up and launches. ABC-1 is a smaller range than what the group usually uses. It is not equipped with a large bunker like WC-50.  Therefore, only two SystemsGo personnel will stay on the range during each launch. ALL others will be evacuated to Tula G. There will be video and radio communications with the pad available at Tula G. 

A small group of SystemsGo essential people will evacuate to a limit of 5 miles out to expedite turn around between launches.

Because of this change, no non-essential personnel should expect to attend the event. Chaperones should be limited and double as drivers if possible. Along with a smaller launch site, there will not be any public viewing for parents and students at Range Control. WSMR COVID restrictions still do not allow for visitors at Range Control.

The second big change will affect the teams and their rockets. ABC-1 is a much smaller range than is generally used for this event. Because of this, it does not meet the criteria in recovery radius needed for vehicles reaching an altitude of 100,000 feet. Schools are now required to alter their rocket altitude requirements to a lesser height of 50,000 feet. The suggested correction for this is to adapt fuel loads for each vehicle to quell the altitude it can reach.

That sounds simple but adjusting fuel load and altitude also effects things like apogee and recovery deployment just to mention. Students are reminded that adjustments to their altimeters and recovery systems to adapt to the 50,000 ‘ Apogee limit is a necessity.

Part of this program is the challenges and meeting those challenges. It is late in the process, but it will be interesting to see how each team steps up to these new  challenges and overcomes them in the time they still have before arriving for launch at WSMR.

The third change is another location change, this time for the Flight Readiness Reviews (FRR). These are normally conducted on WC-50. ABC-1 cannot accommodate this, so they will be hosted by the Alamogordo High School. Currently this is projected to be in their commons room. These will begin promptly at 7:00 AM, Friday morning, June 25th.  Additional information about this may be available in an update email from Program Director, Rebekah Hyatt, closer to the event.

WSMR has military testing on Friday morning. At its completion, SystemsGo personnel will go down range to ABC-1 to begin set-up for launches.  If Brazoswood and Union Grove are complete at this time they will bring their vehicles and assist in set-up, rail assembly, and will load their rockets onto the rails in preparations of first launch. If not, all remaining schools will wait and come as a group later in the day.

Launches are scheduled for June 26th and June 27th. The team will travel out to WSMR on Wednesday, June 24th, and back home again on either the 27th or the 28th. Hopeful expectations are that all rockets are launch complete on Saturday. Sunday is still open for contingency. There is a probability that WSMR may shift launch days and want testing for SystemsGo to be on Friday and Saturday. If this happens the first two rockets will launch Friday afternoon. This would also move FRR checks up to Thursday afternoon at either the school or the hotel parking lot as is available.

SystemsGo asks that everyone be prepared for any scenario and arrive as early as possible on Thursday so that any changes to the schedule can be accommodated. All paperwork must be turned in on Thursday as well. This includes:

  • UXO briefing registry
  • WSMR waiver
  • SystemsGo waiver

There are four schools scheduled to launch four rockets. These schools in their current projected launch order include:

  • Brazoswood
  • Union Grove
  • Booker T Washington
  • Alamo Heights

This order is based on the random draw and totally contingent on rocket completion and readiness. Otherwise, they will test in order of readiness, first done, first to launch.

Good luck to these students and schools! We will be seeing you very soon in New Mexico!

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be greatly benefited.

#Rockets2021 #SystemsGo #RideTheSky #Texasrockettrail #Rockets2021

I Miss All Things Rockets!

I miss all things Rockets!
From travel to set up,
And set up to tear down;


There is not a memory I can call up,
That would make me frown.

I miss all things Rockets!
From the first vertical rail;


The first day’s engine roar;
Watching the first rocket sail,


To anticipating more.

I miss all things Rockets!
Listening for charges to pop,
Watching them float under chute,


Dancing on ethereal winds as they drop,
And searching for them like lost pirate loot.



I miss all things Rockets!
Pictures with the teams,


As their rocket loads the rail.
Hearing students scream,


As their vehicle begins to sail.

I miss all things Rockets!
Searching for a glint of light,
A high pitched whine you might here,
Or a flash of something bright,
Letting you know it is near.

I miss all things Rockets!
From a picture perfect flight


To a ballistic drop.

From racing to grab one in plain sight,
To searching by where you heard the pop.

I miss all things Rockets!
Whether watching the students,
Or listening to Joyce and Phil,


These are quite the events;
Even after years, I am a rocket junky still.

I miss all things Rockets!
From collecting rockets whole,


To picking up pieces;


Students’ smiles light my soul,
Each year the joy increases.

I miss all things Rockets!
It’s education in motion;
Learning with style;
Using hands on application,
Propelling the future all the while.