2024 SystemsGo Rocket Launch Event Preparations for White Sands Missile Range

The SystemsGo team left Fredericksburg in two shifts, one at 5:30 a.m. and the second at 9:15 a.m. this morning headed to Alamogordo,, New Merxico for lodging for White Sands Missile Range (WSMR) rocket launches. Schools from Union Grove, Alamo Heights and Brazoswood also traveled to Alamogordo today to meet and begin preparations for launches this Saturday

The early crew, Rebekah Hyatt, George Burns and Andrew Matthes, set up in the parking lot of the Quality Inn and Suites to preform pressure and FRR checks for Union Grove Thursday afternoon .

Alamo Heights did their pressure test and FRR on Wednesday, but the pressure test will be redone at WSMR for safety.

Steve, Ginger, Caleb and Cash arrived in Alamogordo at 6:00 p.m. Taylor drove in to New Mexico from California, arriving in Alamogordo slightly before us. We all reported driving through pretty serious dust storms on the way here.

As soon as we arrived everyone piled in the van and the SystemsGo team went to La Hacienda for dinner. The tea was good, the service was excellent, as was the salsa. The food was ok. Unfortunately our favorite Mexican place, Margos has permanently closed down, and C J’s Si Senore was packed and close to closing. After dinner our van load went to Wal-Mart for provisions for on the range the next two days.

Portable restrooms are available at the site. Limited electricity is available. Each school is responsible for acquiring food and drinks for their group for all meals and snacks each day. WSMR is not supplying any food this year.

All documentation was completed and turned in to Rebekah Hyatt, Thursday evening upon arrival.

  • UXO, Wildlife, and Driving in WSMR briefing registry
  • WSMR waiver
  • SystemsGo waiver
  • Medical Release Forms

Be prepared to show ID’s at the security check at the gate in the morning.

There are three schools scheduled to launch three rockets. These include:

  • Alamo Heights
  • Brazoswood
  • Union Grove

The current launch schedule is as follows:

  • Friday, June 14th
    1. Depart for site from hotel by 5:00 a.m.
    2. Meet at Tula Gate for Security Checks at 5:45 a.m.
    3. Alamo Heights and Union Grove will be in our caravan from the hotel. Brazoswood will meet us enroute to the Tula Gate.
    4. Travel to ABC-1 at 6:00 a.m.
    5. Site Set up at ABC-1 upon arrival.
    6. Complete all rockets.
    7. 4:00 p.m. Leave the site with Alamo Heights and Brazoswood on the rails and Union Grove completed and ready to load the rail.
  • Saturday, June 15th
  • Launch Day – Three Rockets
  • Depart from Hotel by 5:00 a.m. for 5:45 a.m. arrival at Tula Gate for Security checks.
  • Depart Gate to ABC-1 6:00 a.m.
  • Projected launch schedule:
    • T1 8:00 a.m. – Alamo Heights
    • T2 9:00 a.m. – Brazoswood
    • T3 11:00 a.m – Union Grove
    • All rockets launched by 2:00 p.m.
    • Break for Lunch as each team has time.
    • Pack up site.
    • Range Time Ends – 4:00 p.m.
  • Sunday, June 25th
  • Travel Day/Contingency Day/Cleanup/Fun Day (To be determined.)
  • Monday, June 26th
  • Travel Day only if needed. Hopefully we are already home Mission Complete.

The Goddard level rockets, which are the capstones of the SystemsGo program and the culmination of all the skills the students have learned throughout their years in the STEM program. This marks the final senior project for the schools that participate in for the SystemsGo program.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be benefited.

#Rockets2024 #SystemsGo #Launcher01 #RideTheSky #Texasrockettrail #EyesOnTheSky #TexasToNewMexicoRocketTrail #RideTheSky2024

White Sands Missile Range SystemsGo Rocket Program 2024

White Sands Missile Range is once again hosting the SystemsGo Rocket Program again for its season end launches. This year three schools will be traveling to New Mexico to test their rockets at White Sands Missile Range, they include: Alamo Heights HS, Brazoswood HS, and Union Grove HS.

June 14th through June 16th are the dates for this year’s WSMR launch.  The SystemsGo team and schools will be traveling to Alamogordo, New Mexico for lodging on June 13th. Early on the 14th, preparations at the site will be made with the goal of launching all three rockets Saturday.  The 16th, Sunday, is our contingency day, but the hope is that it will not be needed. Sunday is Father’s Day and WSMR personnel would prefer not to work and we would love to be on the road home.

We continue to launch from range ABC1. This range required the altitude cap for the rockets to be adjusted from the original height cap which was 100,000 feet. The current cap instituted three years ago is 50,000 feet. ABC-1 does not have a large bunker, so only essential launch personnel stay on site, and the SG staff evacuate out five miles for launches. Students and teachers are taken to a secure location known as Tula G, which is further down range where they watch the launches on screen inside a designated facility.

There will be tents on the range, the same as last year. Rockets need to be complete by the end of the day on Friday.

The T-1schedule on Saturday will be very tight. Range time begins at 7:00 am and ends at 4:00 pm. The range is Hot all day for us, which translates to as soon as we can reset and be ready to launch again, WSMR is ready to assist. This should make keeping the schedule and sending all three rockets skyward a viable task for Saturday.

If Mission is Complete on Saturday evening, then evening activities may include some White Sands National Park dune sledding.

SystemsGo team members will be residing at the Quality Inn and Suites in Alamogordo this year.

There are three schools scheduled to launch their rockets. These include:

  • Alamo Heights
  • Brazoswood
  • Union Grove

The current launch schedule is as follows:

  • Thursday, June 13th
    1. Travel Day
    2. Pressure Checks and FRRs that evening at the hotels.
    3. Security checks of all Form 5000s
  • Friday, June 14th
    1. Site Set up ABC-1 7:00
    2. Depart for site from hotel–TBA
    3. Complete all rockets.
    4. 3:00 p.m. Leave the site with Alamo Heights and Brazoswood on the rails.
  • Saturday, June 15th
    1. Launch Day (Three Rockets, barring any schedule changes by WSMR.)
    2. Depart from hotel for arrival on site–TBA
    3. Projected launch schedule:
      • T1 8:00 a.m.
      • T2 9:00 a.m.
      • T3 11:00 a.m.
  • Airspace Ends – 4:00 p.m.
  • Pack site
  • Evening Activities as time allows.
  • Sunday, June 16th
    1. Travel Day-Contingency Day only if absolutely needed. WSMR does not want to work on Father’s Day.
  • Monday, June 17th
    1. Travel Day-Hopefully we are already home.

The Goddard level rockets, which are the capstones of the SystemsGo program and the culmination of all the skills the students have learned throughout their years in the STEM program. This marks the final senior project for the schools that participate in for the SystemsGo program.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be benefited.

#Rockets2024 #SystemsGo #Launcher01 #RideTheSky #Texasrockettrail #EyesOnTheSkies #TexasToNewMexicoRocketTrail #RideTheSky2024

Rockets 2023-WSMR, Saturday Launch Day Report and Mission Complete with Accolades

Three schools tested rockets at White Sands Missile Range today. Brazoswood,  Alamo Heights and Union Grove comprised.

Our first T time was at 8:15 a.m. with Union Grove was the rail ready for launch. Ignition was a go, but unfortunately the nitrous valve did not function properly causing the rocket to burn up on the rail. The vehicle sat burning on the rail for around 30 minutes causing unrepairable damage to the rocket, as it melted through the aluminum body at the aft section. The motor bay broke away from the body, tilting forward, allowing the long body section to fall into it but still all remained on the rail. It had to be extinguished a couple of times and then left to cool until after the next rocket had launched.

Alamo Heights loaded onto the rail next. At 11:15 a.m. they achieved a successful launch in spite of their vent nozzle staying open allowing full vent during fill and launch. Their vehicle was supposed to be fitted with an internal vent flow that would have allowed it to regulate its own vent throughout the whole fill and launch correctly instead of SG having to manually vent, but he believed the students had forgotten to install it. Either way, they had a wonderful flight reaching an altitude of 23,000 AGL. This is one of their best flights in a long while.

Brazoswood was the final launch of the day at around 1:15 p.m.. This year’s launch was nothing short of amazing as well. They made 28,000 AGL, leaving a trail that could be followed in the sky for quite a while. High level winds made it to angel into the wind which caused a loss in some altitude. One of their students set tracking computers using satelites to find and follow the vehicle and mark it’s speed. His preliminary findings suggested the rocket came down under chute, and it actually did. This is a new first. There was one nose cone in 2019 that came down under chute but this accomplished all chutes deploying and all pieces recovered by WSMR today. Great job on that recovery system students.

At 3:30 p.m. WSMR called called everyone in for lunch as they cooked hamburgers and hotdogs for the teams and work crews. The SG teams stopped dismantling the launch pad and joined in for lunch, after which we continued our work, completing tear down and pack up by 4:00 p.m.

Test Center Commander, Colonel Smart, was originally scheduled to be onsite today, but a scheduling conflict made that impossible. However Lori Leyva and her crews were there supporting the launched and so before we left, Rebekah made presentations of certificates to Lori and also Chris Madsen, along with t-shirts and caps to them and all there crew members.

It was most definitely a beautiful launch set this year at WSMR. Great job schools!

Mission was called complete by WSMR at 4:50 p.m. today and all teams and schools pulled away from the site.

Our first stop this evening was for a shower to remove all the dirt devil dust it covered us in multiple times, followed by dinner at Si Senor’s Mexican Food, and a sunset trip to the White Sands Monument Dunes for a quick slide in the light of a red orange sky and the sun dropped quickly behind the horizon.

Tomorrow’s schedule will be a call to load and head home, starting on the road by 8:00 a.m.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be greatly benefited.

#Rockets2023 #TexasRocketTrail #EyesonTheSkies #Ridetheskies #ItisRocketScience #TexasToNewMexicoRocketTrail

2023 Marks 25 Years White Sands Missile Range Hosts Student Rockets

2023 is a year of milestones for the Fredericksburg based STEM rocket program beginning with White Sands Missile Range hosting the SystemsGo Rocket Program again for its season end launches. This event marks the 25th year the STEM based program has brought high school seniors to the Army Base to test the program’s highest-level rockets, known as Goddard. It would have marked 25 consecutive years, but COVID took out 2020 putting the numbers behind by a year. The program took its first rocket from Fredericksburg High School to WSMR in 1999. The nonprofit organization supporting this STEM program in schools officially began in June of 2003, making this 2023 season its 20th Anniversary as well. This year three schools will be traveling to New Mexico to test their rockets at White Sands Missile Range, they include: Alamo Heights HS, Brazoswood HS and Union Grove HS.

June 23rd through June 25th are the dates for this year’s WSMR launch.  The SystemsGo team and schools will be traveling to Alamogordo, New Mexico for lodging on June 22nd. Early on the 23rd, preparations at the site will be made with the goal of launching all three rockets Saturday afternoon.  The 25th is our contingency day, but it is only a contingency for completing cleanup at the site, or if WSMR must delay our launches. It will not be a day to recycle rockets that fail.

We continue to launch from range ABC1. This range required the altitude cap for the rockets to be adjusted from the 20-mile radius the program previously had available for these test vehicles to travel and stay within their parameters. The original height cap was 100,000 feet. The current cap instituted two years ago is 50,000 feet. ABC-1 does not have a large bunker, so only essential launch personnel stay on site, and the SG staff evacuate out five miles for launches. Students and teachers are taken to a secure location known as Tula G, which is further down range where they watch the launches on screen inside a designated facility. Parents are no longer allowed to come, since the theater at Mission Control is no longer the viewing area. Volunteer staffing of base personnel for this has still not resumed.

Schools are asked to arrive early on the 22nd in Alamogordo to do pressure checks with as little time spent on configuration as possible. At least two vehicles need to have this stage complete before heading down range on the 23rd.  Preferably very little time will be spent on assembly on the 23rd. Some weight, CG, and FFR verification can be done if needed downrange the 23rd.  There will be tents on the range, the same as last year. Rockets need to be complete by the end of the day on Friday.

The first T time on Saturday will be 8:00 a.m. After that the range is Hot all day for us, which translates to as soon as we can reset and be ready to launch again, WSMR is ready to assist. This should make keeping the schedule and sending all three rockets skyward a viable task for Saturday.

WSMR personnel, including Test Center Commander, Colonel Shawanta Smart, and Range Operator, Lori Leyva, will be on site during the launches. WSMR will be providing lunch for all participants. Colonel Smart began her command in August of 2021, making this her second rocket season with the program. She stopped in last year for a brief visit, but plans to be onsite to see more of how the program operates. Ms. Leyva will be retiring after this year. Her service in coordinating SystemsGo and WSMR in launch efforts has been extremely beneficial to the program over the years she has been with us. SystemsGo will be making special presentations during the lunch break.

Saturday is a contingency day, but preferably it should be no more than a site cleanup day if needed that morning. Provided that we accomplish this early the remainder of the day’s activities will be decided at that time.

SystemsGo team members will be residing at the Quality Inn and Suites in Alamogordo this year.

There are three schools scheduled to launch four rockets. These include:

  • Union Grove
  • Alamo Heights
  • Brazoswood

The current launch schedule is as follows:

  • Thursday, June 22nd
    1. Travel Day
    2. Pressure Checks and FRRs that evening at the hotels.
    3. Security checks of all Form 5000s
  • Friday, June 23rd
    1. Site Set up ABC-1 9:00- 9:30 a.m.
    2. Depart for site from hotel by 7:45 a.m.
    3. Complete all rockets.
    4. Leave the site with Union Grove and Alamo Heights on the rails.
  • Saturday, June 24th
    1. Launch Day (Three Rockets, barring any schedule changes by WSMR.)
    2. Depart from hotel by 4:45 a.m. for 6:00 a.m. arrival on site.
    3. Projected launch schedule:
      • T1 8:00 a.m. –
      • T2
      • T3
      • Break for Lunch 2:00 p.m. – 3:00 p.m.
      • Range Time Ends – unspecified currently.
  • Sunday, June 25th
    1. Contingency Day/Cleanup/Fun Day/ Travel (To be determined.)
  • Monday, June 26th
    1. Travel Day

The schedule as seen above is a preliminary estimate, and though accurate as stated by Program Director, Rebekah Hyatt, at the moment, is subject to changes and adjustments as needed once the entire group is in New Mexico.

The Goddard level rockets, which are the capstones of the SystemsGo program and the culmination of all the skills the students have learned throughout their years in the STEM program. This marks the final senior project for the schools that participate in for the SystemsGo program.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be benefited.

#Rockets2023 #SystemsGo #Launcher01 #RideTheSky #Texasrockettrail #EyesOnTheSkies #TexasToNewMexicoRocketTrail

White Sands Missile Range Hosts SystemsGo’s 2022 Goddard Level Rockets in 5 Days

White Sands Missile Range has been hosting the SystemsGo Rocket Program for over 20 years, and the tradition continues for the 2022 season. Changes have been made over the years, including moving from the original launch site which was West Center 50 (WC50) to alternate range ABC1. This change came about after the COVID shut down of 2020.  Back logged government contracts took precedence for the larger range, necessitating the program’s relocation for continued support at the base.

The move to the smaller range also required the altitude cap for the rockets to be adjusted. The smaller site meant less than the 20-mile radius the program previously had available for these test vehicles to travel and stay within their parameters. The original height cap was 100,000 feet. The new cap instituted last year is 50,000 feet. ABC-1 does not have a large bunker, so only essential launch personnel stay on site, and the SG staff evacuate out five miles for launches. Students and teachers are taken to a secure location known as Tula G, which is further down range where they watch the launches on screen inside a designated facility. Due to this change, parents are no longer allowed to come. In years past parents watched from the theater at Mission Control. Unfortunately, volunteer staffing of base personnel for this is no longer available.

Stage 1 and 2 will take place on the range this year. In years past with the exception of last year, this was normal progression. Last year the Alamogordo High School hosted this part of the event. Stage 1 and 2 will take place while the SG team sets up the pad, launch rails, fill and fire system and electronics trailers. Rockets need to be complete by the end of the day on Friday as there will be very little latitude between T times to complete work on the vehicles. We are to be Mission Complete by 5:00 p.m. on Saturday.

Sunday is a contingency day, but preferably it should not be no more than a site clean up day if needed that morning . Provided that we accomplish this early the remainder of the day’s activities will be decided at that time.

Due to higher prices for accommodations, the SG team and schools will stay at a hotel on the base.  Since we will be approaching from the Las Cruces side of the range instead of Tula Rosa, travel time will increase as speeds are slower, most are two lane roads, and range police are strict. Please check with your teachers if you need information about our accommodations, as I do not think it is appropriate to post it here since it is not outside the base. For those who are still staying off base, be sure to keep up with schedules and times as they group will need to move together with an escort through the base.

Launches are scheduled for June 25th with a contingency/cleanup day for June 26th. The team will travel out to WSMR on Wednesday, June 23rd, and back home again on the 27th.

There are four schools scheduled to launch four rockets. These include:

  • Alamo Heights
  • Brazoswood
  • Fredericksburg
  • Union Grove

The current launch schedule is as follows:

  • Thursday, June 23rd
    1. Travel Day
  • Friday, June 24th
    1. Site Set up ABC-1 8:00- 8:30 a.m.
    2. Depart for site from Main gate by 7:00 a.m. start time.
    3. Leave the site with Fredericksburg and Union Grove on the rails.
  • Saturday, June 25th
    1. Launch Day (All Four Rockets, if possible, at 2-hour intervals.)
    2. Depart from Main gate by 5:00 a.m. for 6:30 a.m. arrival on site.
    3. Projected launch schedule:
      • T1 8:00 a.m. -Union Grove
      • T2 10:00 a.m. -Fredericksburg
      • T3 12:00 p.m. -Alamo Heights
      • T4 2:00 p.m. – Brazoswood
      • 5:00 p.m. – Range Time Ends
  • Sunday, June 26th
    1. Contingency Launch Day/Cleanup/Fun Day/ Travel (What happens depends with launches Saturday.)
  • Monday, June 27th
    1. Travel Day

The Goddard level rockets, which are the capstones of the SystemsGo program and the culmination of all the skills the students have learned throughout their years in the STEM program. This marks the final senior project for the schools that participate in for the SystemsGo program.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be benefited.

#Rockets2022 #SystemsGo #Launcher01 #RideTheSky #Texasrockettrail #EyesOnTheSkies

June 18-2 More Days Until Goddard Level Rocket Launches- Here’s What’s Happening for WSMR

The SystemsGo team leaves in shifts starting today for New Mexico to launch rockets at White Sands Missile Range (WSMR). Rebekah Hyatt and Scott Netherland head out this morning. They have some business meetings in New Mexico ahead of the launch days. Then the rest of the team and schools leave on Wednesday, June 20. That is two days from today. The list and schedules have been finalized and packing is underway.

The schedule will proceed as follows:

Wednesday will be a travel day to Alamogordo, NM to the hotel.
Thursday morning will be T-1 briefing preceded by a live viewing of a missile test at the range.
Thursday afternoon they will travel to West Center 50 Range and do site set up and rocket prep-Fredericksburg rocket will be left on the launch rail ready for first launch on Friday morning.
Friday launch order: Fredericksburg, Brazoswood, Booker T., and Anahuac
Saturday launch order: Union Grove, Alamo Heights
Sunday launch order: Contingency day with four available launch times if needed, or travel home if all vehicles have tested.
Monday will be travel back home day for the group if they are unable to leave on Sunday.

The final list of schools participating in this year’s WSMR tests is:

  • Alamo Heights High School
  • Anahuac High School
  • Brazoswood High School
  • Booker T. Washington High School
  • Fredericksburg High School
  • Union Grove High School

Parents and students already on the approved list with SystemsGo, and attending, be sure you have your proper identification with you. State driver’s license, federal pass port, or state id card are required for access to the base. Also be sure they have medical insurance information with them in case of an emergency.

Please be advised that WSMR is an Army base and does not allow spectators in to view these launches. Only the students, personnel, and parents who have been previously approved through SystemsGo and added to the list may enter the base with the group. Please do not drive to White Sands and attempt to enter on your own, or expect to do so with the group, because you will be turned away.

Event details will continue to be available here. I will provide information as made available to me from team members on site as to how launches have gone for those schools testing on that particular day. Pictures are not allowed on the range, but some pictures of teams getting ready to leave for the range with their vehicles might be available. If anything is available and passed on, I will post it for your viewing pleasure.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be greatly benefited.

Friday, SystemsGo’s Rockets 2016 Officially Ends as Team Travels Home and Transitions into Next Year Preps

At 7:30 a.m.  this morning, the SystemsGo team and Fredericksburg students traveled home from White Sands Missile Range, arriving safely in Fredericksburg around 5:30 p.m.

WSMR marks the end of another successful year with launches in Houston, Willow City included. The group helped test 90 Tchaikovsky and Oberth rockets and 7 Goddard level rockets for the Rockets 2016 season.

Now the volunteer staff returns to their daily lives and the SystemsGo team enjoys a much needed break before continuing with more schools, students and rockets. It won’t be long and the “launch season” will be back again with Rockets 2017. This coming season will start a little earlier with launches in April for the new New Mexico schools that will be coming online. It should prove to be an exciting year.

For now, SystemsGo transitions back to helping schools and teachers implement this STEM based program so that more students can participate in this system of learning.

That concludes Friday’s WSMR Rocket update.

www.systemsgo.org as always is the place for more information on this program. Take the time to get your school involved, the future of your students will be greatly benefited. SystemsGo is a Texas-based STEM curriculum program.

Team photo includes from left to right, (SystemsGo founder), Cade Ottmers, Brian Heffner, Josh Hampton, Chelsea Burow, Gene Garrett, Steve Burow, Randy Kuhlmann, Robert Dever, and Andrew Matthes (FHS STEM program instructor).

Thursday, Final WSMR Launch Day

Today was the final day of testing at WSMR for SystemsGo student programs. Fredericksburg was the only official launch scheduled, with two remaining test times for any retests needed. Unfortunately it was a sad day for Fredericksburg as well. Their rocket had ignition but the injector failed therefore it never left the pad.

At first they were going to allow them a second test time at 12:30 p.m. but after inspection it was determined that they did not have enough spare components to repair the vehicle and so the second test was scrubbed.

At that point the SystemsGo team, Fredericksburg students and WSMR personnel cleaned up West Center 50 and left, officially ending our White Sands Missile Range launch operations.

This evening the team gets some much-needed rest time before returning to Fredericksburg. Except for Chelsea and Steve they are returning to Lubbock this evening and then to Fredericksburg on Friday evening. The team and the Fredericksburg students spent the afternoon seeing the New Mexico Museum of Air and Space and the White Sands National Monument, where they met the challenge of climbing and sliding down the dunes.

Tomorrow is back to Texas and a long Fourth of July Holiday weekend.

There were four out of seven rockets that left the rail this year. Seven out of seven would have been even better but this is still a good end to the season. The thing to bear in mind is that with all these tests whether they leave the rail or not there is always and element of further knowledge to be obtained from what transpired with each vehicle. That deducing, understanding and learning from both what went right and what went wrong whether the vehicle launched of not, and all the education and skills each student learned to get it to this point is the true important lesson.

Thank you so much to White Sands Missile Range for all the support, man power, time, education, entertainment, information and fun you provided in order for SystemsGo and these four schools to come out and test their vehicles. Your continued support in this education of future generations is highly appreciated.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be greatly benefited.

The picture on this blog piece is of the Fredericksburg rocket team this morning prior to their vehicle test. It was provided by team member Zane Brown. Team members are from left to right: Katie Habecker, Link Millard, Dorian Jones, Garrett Ottmers, Nathan Weatherford, Alex Scudder, Zane Brown, and teacher, Andrew Matthes.

Late Update to Wednesday, Launch Day 2 at WSMR

This is just a quick update to my earlier post. Booker T Washington has decided not to go for a retest on either of their failed rockets today. That means Fredericksburg is tomorrow’s only attempted launch test. It’s T time is 8:30 a.m.

Wednesday, Launch Day 2 at WSMR

The Anahuac rocket left the rail this year at 8:36 a.m. It traveled 171 meters (appx. 576.27’).  The Estes motor blew out at ignition as the rocket started its lift off. This caused the rocket to spiral upward and eventually nose over and continue into the range a few hundred yards to the right of the launch rail, digging a crater and leaving dust for some distance. The Anahuac teachers were prepared and blew party horns to celebrate as soon as the vehicle came to rest. Congratulations Anahuac on your first successful launch!!!!!

The next two T times were both held by Booker T Washington High School. Both of these rockets were carrying a payload consisting of a PVC container with space pebbles that they were testing to see how they would react upon reentry to the earth’s surface.

Unfortunately it was not a good day for Booker T. They achieved success in making it to the pad, but flight was not to be. Neither vehicle left the pad.

On the 11:00 a.m. test of Golden 5 the Junior class rocket, the valve froze shut not allowing the Nitrous Oxide to mix with the fuel at ignition resulting in a small puff of smoke and a misfire.

The 2:15 p.m. test of their Senior class rocket, failed due to a fault in the ignition wire  which resulted in no ignition and the system venting out the Nitrous. There is no word at this time as to whether either vehicle will be able to retest in one of tomorrow’s two available retest T’s. Even if one of the vehicles can be repaired in time there may not be more Nitrous available for them to conduct any additional testing.

At this time, the 8:30 a.m. T time is scheduled for Fredericksburg’s Red Bird #17 rocket. If no other retesting occurs, then the mission will be complete, then clean up and pack up will end the day for SystemsGo, students, and WSMR personnel.

Good luck to Fredericksburg and tomorrow and safe travels to all schools heading home.

Tomorrow’s test schedule is as follows:

  • 8:30 a.m. Fredericksburg
  • 11:00 a.m. Retest (1)
  • 2:00 p.m. Retest (2)

Event details will continue to be available here. I will provide more information each morning as to how the schedule and other event details will progress for that day and how launches went for the schools testing that day. Pictures are not allowed on the range, but some pictures of teams getting ready to leave for the range with their vehicles might be available. If anything is available I will post it for your viewing pleasure.

www.systemsgo.org as always is the place for more information on this program. You may also email them at info@systemsgo.org .Take the time to get your school involved, the future of your students will be greatly benefited.

The picture was provided by parent, Teresa Moore, of the Anahuac High School Rocket team after their launch here at WSMR. Students pictured are (not in order) Anne-Marie Henry, Madalyn Orozco, Maria Magana, Kaitelynn Innerarity, Mason Duhon, Shon Patton, Dante Nguyen, Beau Cendejas, Austin Hodges, Meghan Thomas, Zack Rose, and Caleb Moore.